Rocket Motor For Ariane 6 And Vega-C Is Cast For Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Oct 20, 2017

Rocket Motor For Ariane 6 And Vega-C Is Cast For Testing

P120C Is Largest Solid-Propellant Rocket Motor Ever Built

The first full-scale model of the rocket motor that will propel Ariane 6 and Vega-C into orbit has been cast and filled with inert propellant for testing at Europe’s Spaceport in French Guiana. The P120C is the largest solid-propellant rocket motor ever built in one segment.

Each P120C will hold over 140 metric tons of propellant in a carbon fibre casing almost 11.5 m long and about 3.4 m in diameter. It is derived from Vega’s current first stage motor, the P80, which holds 88 metric tons of propellant. The design builds on existing expertise and lessons learned with Vega’s P80, and it increases Vega performance with Vega-C. Two or four P120Cs will be strapped onto Ariane 6 as boosters for liftoff.

The model casing, shipped this summer from Avio in Italy, took about 36 hours to fill with inert propellant blended at Europe’s launch base in Kourou.

Using non-ignitable fluid that has a similar density to the real propellant meant that engineers could safely test all the new equipment and procedures. Filled and sealed, the fluid in the casing could stabilise, cool and harden – the curing process – which took 10 days.

Further tests on the motor, now horizontal, will confirm that it is ready to be integrated with other structures in January. These tests are a step towards casting active propellant in November with a P120C development motor that will be static fired in April.

Vega-C is expected to debut in mid-2019, increasing performance from Vega’s current 1.5 t to about 2.2 t in a reference 700 km (435 mile) polar orbit. Ariane 6’s maiden flight is planned for 2020. This new launch vehicle will be gradually phased in to succeed Ariane 5.

(Image provided with ESA news release)

FMI: www.esa.int

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC