AD: Diamond Aircraft Industries GmbH Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, May 24, 2018

AD: Diamond Aircraft Industries GmbH Airplanes

AD NUMBER: 2018-10-10

PRODUCT: Certain Diamond Aircraft Industries GmbH Model DA 42 airplanes.

ACTION: Final rule; request for comments

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-01-12, AD 2017-11-08, and AD 2017-15-09 for the aircraft listed above.

This AD results from mandatory continuing airworthiness information (MCAI) issued by the aviation authority of another country to identify and address an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as uncommanded engine shutdown during flight due to failure of the propeller-regulating valve caused by hot exhaust gases coming from fractured engine exhaust pipes.

DATES: This AD is effective June 12, 2018.  Comments must be received by July 9, 2018.

COST: The FAA estimates that this AD will affect 130 products of U.S. registry. The cost of compliance is estimated as follows:

  • Inspect engine exhaust pipe - $170 per aircraft for two hours labor.
  • Install additional engine exhaust pipe clamps with spring washers - $440 per aircraft for parts and labor.
  • Inspect engine exhaust pipe clamps - $170 for per aircraft two hours labor.

The following costs to do any necessary replacements that will be required based on the results of the inspections are estimated to be:

  • Replace cracked engine exhaust pipe - $2,240 per aircraft for parts and labor.
  • Replace cracked engine exhaust pipe clamps - $440 per aircraft for parts and labor.
FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC