F-35C Completes Initial Catapult Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Nov 01, 2011

F-35C Completes Initial Catapult Testing

Aircraft Performed 'Better Than Predicted'

F-35 integrated test force personnel and F-35C test aircraft CF-3 returned to NAS Patuxent River last week after completing two major catapult test events. Starting this past summer, the test team put the carrier variant of the Joint Strike Fighter through its first set of catapult launches. The goal was to complete an initial structural survey of the aircraft to withstand launch stresses and the impact of steam ingestion into the engine.

U.S. Navy Photo

"The testing went very well," said Tom Chaillou, lead government ship suitability engineer. "The aircraft completed the structural survey, and the steam ingestion was a non-factor. The team spent a lot of time up at Lakehurst [NJ] away from home, and just did a tremendous job."

The team completed more than 50 launches to collect the needed data. The steam ingestion data produced robust results, allowing the team to reduce the number of test launches by four. "[The F-35C] did really well from the cockpit perspective," said Cmdr. Eric Buus, F-35 test pilot. "The aircraft actually flew away after launch a bit better than was predicted."

Catapult testing will continue at Lakehurst and Patuxent River to include launches at varying weights and stores, and with increased mission system functionality.

The F-35C carrier variant of the Joint Strike Fighter is distinct from the F-35A and F-35B variants with its larger wing surfaces and reinforced landing gear to withstand catapult launches and deck landing impacts associated with the demanding aircraft carrier environment. Initial carrier trials for the F-35C are scheduled for 2013. The F-35C is undergoing test and evaluation at NAS Patuxent River before delivery to the fleet.

FMI: www.navy.mil

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

NTSB Final Report: Capella Aircraft Corp FW1C50

Pilot Reported That He Was Unfamiliar With The Single Seat Amateur-Built Airplane And His Intent Was To Perform High-Speed Taxi Testing Analysis: The pilot reported that he was unf>[...]

Classic Aero-TV: Timber Tiger Touts Curtiss Jenny Replicas

From 2023 (YouTube Edition): First Kits to Ship October 2023 Having formerly resurrected the storied shape of the Ryan ST—in effigy, anyway—Montrose, Colorado-based Tim>[...]

ANN's Daily Aero-Term (07.04.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC