STS-124 Completes Second Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jun 06, 2008

STS-124 Completes Second Spacewalk

Garan, Fossum Install Cameras On Kibo

Mission Specialists Mike Fossum and Ron Garan completed the second STS-124 spacewalk Thursday. The 7-hour, 11-minute excursion ended at 1815 EDT.

The astronauts completed a number of tasks to outfit the Kibo Japanese Pressurized Module, or JPM. They installed television cameras on the front and rear of the JPM to assist Kibo robotic arm operations, removed thermal covers from the Kibo robotic arm, and prepared an upper JPM docking port for Friday's attachment of the Kibo logistics module.

The spacewalkers installed two cameras on the Japan Aerospace Exploration Agency’s Kibo laboratory. NASA says these cameras will be used to judge clearances for the module’s robotic arm.

Garan and Fossum also prepared the laboratory’s top active common berthing mechanism for the attachment of the smaller section of the module, the Japanese Experiment Logistics Module -- Pressurized Section, which was delivered during STS-123.

In addition, the two spacewalkers made preparations for a nitrogen tank assembly swap they will make on their third spacewalk, scheduled for Sunday. They also removed an external television camera that had a failing power supply.

Fossum also inspected the space station's port solar alpha rotary joint, or SARJ. Unlike the starboard SARJ, the port SARJ has performed flawlessly. The inspection was done to ensure the port SARJ remains in good condition.

This was Fossum's fifth spacewalk, Garan's second, the 111th spacewalk devoted to space station assembly and maintenance, the 12th of 2008, and the 196th by  astronauts.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC