NTSB Issues Urgent Safety Recommendation On Sikorsky S-76 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.02.25

Airborne-NextGen-06.03.25

AirborneUnlimited-06.04.25

Airborne-AffordableFlyers-06.05.25

AirborneUnlimited-06.06.25

Sat, Nov 19, 2005

NTSB Issues Urgent Safety Recommendation On Sikorsky S-76

Recommends FAA Require Checks Into MRA Internal Leakage

The National Transportation Safety Board (NTSB) has issued two recommendations that the FAA immediately require Sikorsky S-76 operators conduct immediate checks into leakage in the internal assemblies of the helicopters' main rotor actuators.

The NTSB's specific recommendations are as follows:

(Urgent A-05-33)

  1. Conduct an immediate internal leakage test of all main rotor actuators with more than 500 hours since new and/or overhaul;
  2. Conduct subsequent recurring tests at a period not to exceed 500 hours;
  3. Report the test results to the Federal Aviation Administration and/or Sikorsky; and
  4. Correct any problems as necessary.

(Urgent A-05-35)

The NTSB recommends the FAA require Sikorsky S-76 helicopter operators to:

  1. Conduct immediate visual and laboratory examinations of hydraulic fluid and filter elements in hydraulic systems with actuators with more than 500 hours since new and/or overhaul for plasma flakes or other contamination that exceeds the manufacturers' allowable limits of concentration and size;
  2. Conduct subsequent recurring tests at a period not to exceed 500 hours;
  3. Report findings of contamination and flakes to the Federal Aviation Administration and/or Sikorsky and
  4. Correct any problems as necessary.

The NTSB also recommends the FAA direct the principal operations inspectors of all Sikorsky S-76 helicopter operators to reemphasize the importance of, and requirement for, a preflight check of control movement smoothness and flight control 'stick-jump' at every engine start.

FMI: View the complete recommendation letter (PDF)

Advertisement

More News

ANN's Daily Aero-Term (06.03.25): No Gyro Approach

No Gyro Approach A radar approach/vector provided in case of a malfunctioning gyro-compass or directional gyro. Instead of providing the pilot with headings to be flown, the contro>[...]

ANN's Daily Aero-Linx (06.03.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Airborne 05.30.25: Anti-Helicopter Bill, PW Strike Done, All-Electric Bristell

Also: Duffy Wants $$$, KS Airports, Morningside U’s Aviation School, New Airstrip In ID After 6 were killed in a helicopter crash over the Hudson River, several US Representa>[...]

Airborne 05.29.25: ATC Bonu$, VX4 eVTOL Flies, Starship 9 Test

Also: Hermeus Quarterhorse MK1, Seaplane Rating Guide, Vietjet A330neos, SFO Wacky Weed Bust As the air traffic controller shortage trudges on, the US Department of Transportation >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC