Atlantis Continues On Track For November Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Oct 06, 2009

Atlantis Continues On Track For November Launch

Orbiter Scheduled To Move To VAB Tuesday

At NASA's Kennedy Space Center in Florida technicians were back in Orbiter Processing Facility-1 Monday performing final checks on space shuttle Atlantis. The vehicle is set to move, or rollover, to the Vehicle Assembly Building Tuesday with first motion scheduled for 0700 EDT.

In the VAB, the external tank and solid rocket boosters, now secured in place, also are undergoing final checks and testing.

After Atlantis is joined with the tank and boosters, the giant crawler-transporter will be rolled under the mobile launcher platform. The entire stack now is scheduled to roll out to Launch Pad 39A on October 13.

Meanwhile, at NASA's Johnson Space Center in Houston, the STS-129 crew members will be reviewing deorbit burn procedures and space station systems manuals, and practicing heat shield repair techniques.

The astronauts are scheduled to fly to Kennedy on Oct. 19 to participate in the three-day Terminal Countdown Demonstration Test, or TCDT. Typically held prior to launch, TCDT gives the crew an opportunity to check the fit of their spacesuits, practice emergency evacuation procedures at the launch pad, review firefighting methods, and participate in briefings on security and range safety.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC