Endeavour Countdown Set To Begin Again | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Jul 03, 2009

Endeavour Countdown Set To Begin Again

Launch Planned For July 11th

Launch preparations are under way at NASA's Kennedy Space Center in Florida following Wednesday's successful test fueling of space shuttle Endeavour's external tank.

Two previous attempts to launch Endeavour on the STS-127 mission were halted by a leak in the area of the Ground Umbilical Carrier Plate, which attaches a gaseous hydrogen vent line to the external tank. After several days of investigation and repair work, the massive orange tank was filled with liquid hydrogen and liquid oxygen as controllers watched for evidence of leaks. The system performed well, verifying the success of the repair.

"There were absolutely no leak indications whatsoever noted on the two leak detectors," said Launch Director Pete Nickolenko. "We'll continue to look at the data, and our next step is to move toward launch."

Endeavour's astronauts are taking the holiday weekend off and will go into quarantine Sunday evening. They are due to arrive at Kennedy on July 7th. The countdown will officially begin Wednesday at 2200 when clocks begin ticking backward from T-43 hours. Liftoff is set for July 11 at 1939.

FMI: www.nasa.gov

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Rutan Long-EZ

The Pilot Attempted Several Times To Restart The Engine And Diverted To Long Beach Airport/Daughtery Field On October 20, 2025, about 1603 Pacific daylight time, an experimental am>[...]

ANN's Daily Aero-Term (12.05.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (12.05.25)

"The latest development underscores the government of Malaysia’s commitment in providing closure to the families affected by this tragedy..." Source: From statements made by >[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC