Congress Earmarks $350 Million For NASA Hurricane Repairs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Dec 20, 2005

Congress Earmarks $350 Million For NASA Hurricane Repairs

Bill Must Still Pass Senate Muster

A $29 billion relief bill passed by the US House of Representatives Monday, to fund rebuilding efforts in the hurricane-ravaged states along the US Gulf Coast, also contains $350 million to repair damage incurred to NASA facilities in the wrath of Hurricanes Katrina and Rita.

According to Reuters, the hurricane funds -- $10 billion more than President Bush had requested -- were attached to an unrelated defense spending bill that has not yet been approved by the Senate.

In fact, a tougher-than-average fight for passage is expected in that chamber, because of opposition to another provision attached that would open a portion of Alaska's Arctic Natural Wildlife Reserve (ANWR) to oil drilling -- something that has proven to be a bill-killer in the past.

As was reported earlier this month in Aero-News, NASA had asked for as much as $760 million in funding to repair damage to the agency's Michoud Assembly Facility outside New Orleans -- where the shuttle's external fuel tank is built -- and the similarly stricken Stennis Space Center in Mississippi. The Office of Management and Budget had countered with $325 million.

NASA's Johnson Space Center in Houston, TX also suffered damage in Hurricane Rita, although most of it was minor.

The lower sum might mean NASA will have to dip into its 2006 operating budget to make the needed repairs -- and with the costs of maintaining the shuttle program in addition to beginning development on NASA's next-generation family of space vehicles, it's not as though there was money to spare.

As of now, however, the agency can't even count on the $350 million.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC