Private Japanese Spacecraft Prepares for Lunar Landing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, May 10, 2025

Private Japanese Spacecraft Prepares for Lunar Landing

Ispace Begins One-Month Countdown as its Resilience Lander Enters Lunar Orbit

Tokyo-based aerospace company ispace announced on May 7 that its lunar lander, dubbed Resilience, has made its way into orbit around the moon. The spacecraft is now officially one month out from its inaugural lunar landing.

Resilience launched on January 15, 2025, from NASA’s Kennedy Space Center near Titusville, Florida. The SpaceX Falcon 9 rocket also carried Firefly Aerospace’s Blue Ghost lunar lander, which took a slightly faster path and successfully touched down on the moon on March 2.

The landing was upright, stable, and within 100 meters of its landing target near Mons Latreille, making Firefly the first commercial company to have its tech successfully touchdown on the moon. Blue Ghost completed its NASA mission on March 16 after dropping off 10 instruments and capturing several photos and videos.

Just a few days later, American-based Intuitive Machines attempted a lunar landing of its own with its Athena spacecraft. However, it ended up sideways and was unable to recharge its solar batteries, resulting in its death. The company’s first lunar lander, Odysseus, met a similar demise in 2024.

Japanese manufacturer ispace is hoping for a more positive turnout. The HAKUTO-R M2 Resilience lunar lander is currently in lunar orbit and is targeting the first week of June to touch down. It is carrying a mini rover with a scoop to take a lunar dirt sample and perform several other experiments. If all goes well, the company will have redeemed itself for a pretty significant mission anomaly in 2023.

The ispace Hakuto-R lander was well on its way to becoming the first privately developed spacecraft to make a controlled landing on the moon when, on April 25, 2023, flight controllers lost contact. Days later, ispace confirmed that it had miscalculated its altitude due to a large cliff and plummeted three miles into the moon’s surface.

FMI: https://ispace-inc.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC