Cobham Announces ADS-B INTEGRITY Test Application | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Nov 02, 2016

Cobham Announces ADS-B INTEGRITY Test Application

New Product Introduced At The 2016 NBAA-BACE Convention And Tradeshow In Orlando

Cobham AvComm, has announced its new ADS-B INTEGRITY Test Application. The new app controls Cobham’s IFR6000 or IFR6015 Transponder Test Sets and GPSG-1000 Positional Simulator to support Supplemental Type Certification (STC) and post approval testing for ADS-B equipment installations per FAA Advisory Circular AC 20-165B.

For R&D and factory test, the app will control Cobham’s IFF-45TS/A MK XII/A Bench Test Set and the GPSG-1000 for ADS-B Out performance. A complete, detailed ADS-B Out compliance report in FAA format, including a measurement for total latency, can be generated showing Pass/Fail criteria.

The following is taken from the FAA.gov website:

  • Any airspace that requires the use of a Transponder today will on January 01, 2020 also require aircraft to be equipped with a Version 2 ADS-B Out system. This can be either a 1090ES (DO-260B) ADS-B system or a UAT (DO-282B) ADS-B system.
  • For aircraft operating above FL180 (18,000 ft.) or to comply with ADS-B mandates outside the United States, you must be equipped with a Mode-S transponder-based ADS-B transmitter. For aircraft operating below 18,000 ft. and within the United States ADS-B rule airspace, you must be equipped with either a Mode-S transponder-based ADS-B transmitter or with UAT equipment.

“We’re very excited to introduce to the industry an application that will allow a complete test of AC 20-165B prior to flying the aircraft,” said Guy Hill, Director of Avionics Test Products for Cobham AvComm. “Equipment installations can be completed more quickly and with fewer issues to help save time and money.”

(Source: Cobham news release)

www.cobham.com/avcomm

Advertisement

More News

ANN's Daily Aero-Linx (04.30.25)

Aero Linx: Aviators Code Initiative (ACI) Innovative tools advancing aviation safety and offering a vision of excellence for aviators. The ACI materials are for use by aviation pra>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Agile Aero’s Jeff Greason--Disruptive Aerospace Innovations

From 2016 (YouTube Edition): Who You Gonna Call When You Have a Rocket Engine that Needs a Spacecraft? While at EAA AirVenture 2016, ANN CEO and Editor-In-Chief, Jim Campbell, sat >[...]

Aero-News: Quote of the Day (04.30.25)

"In my opinion, if this isn't an excessive fine, I don't know what is... The odds are good that we're gonna be seeking review in the United States Supreme Court. So we gotta muster>[...]

ANN's Daily Aero-Term (04.30.25): Expedite

Expedite Used by ATC when prompt compliance is required to avoid the development of an imminent situation. Expedite climb/descent normally indicates to a pilot that the approximate>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC