NASA, ATK Conduct First Launch Abort System Igniter Test For Orion | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Jun 17, 2008

NASA, ATK Conduct First Launch Abort System Igniter Test For Orion

Preliminary Results Show Igniter Performed As Expected

NASA and Alliant Techsystems reached another milestone Friday with the successful test firing of a critical safety component for the next-generation Orion crew exploration vehicle. A 36-inch-long igniter for the abort motor of Orion's launch abort system was fired at ATK's facility in Promontory, UT.

Orion is part of the Constellation Program of spacecraft and systems NASA is building to carry astronauts to the International Space Station and conduct sustained human exploration of the moon. The abort motor, the primary motor in the launch abort system, is designed to pull the crew capsule away from the Ares I launch vehicle in an emergency situation while on the pad or during the first 300,000 feet of ascent after launch.

In less than a second, the igniter generated approximately 21,000 pounds of thrust and produced combustion gas temperatures of more than 5,800 degrees Fahrenheit. Engineers will use the test firing to evaluate the igniter's ballistic properties and pressure created inside its chamber. Preliminary data indicate the igniter performed as expected.

The igniter is designed to fit inside the aft end of the abort motor for Orion's launch abort system. In the event of an emergency, it will be used to ignite the solid propellant inside the abort motor casing. The motor uses a unique reverse flow technology with four nozzles mounted on the forward end. Once ignited, it will produce nearly a half-million pounds of thrust within milliseconds to pull the Orion crew module safely away from the Ares I rocket.

Friday's test was the first in a series of three igniter open air tests scheduled for 2008. A full-scale abort motor ground test will be conducted in September. In December, the entire Orion launch abort system will be demonstrated during a flight test at the US Army's White Sands Missile Range in New Mexico.

The abort system is a key element in NASA's continuing efforts to improve safety as the agency develops the next generation of spacecraft to return humans to the moon. NASA's Langley Research Center in Hampton, VA manages the launch abort system design and development effort with partners and team members from NASA's Marshall Space Flight Center in Huntsville, AL.

Langley's Launch Abort System Office performs this function as part of the Orion Project Office located at NASA's Johnson Space Center in Houston. Orbital Sciences Corporation of Dulles, VA is building the launch abort system for Lockheed Martin Corporation of Bethesda, MD, the prime contractor for Orion.

NASA will post video of the test on the Constellation Program Web site when it is available.

FMI: www.nasa.gov/constellation, www.atk.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC