Boeing Team Rebuilds B-1 'Backbone' | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Mon, Jun 01, 2009

Boeing Team Rebuilds B-1 'Backbone'

Damaged B-1 Returned To Service

A USAF B-1B bomber returned to flight last week after a Boeing team replaced its catastrophically damaged upper-center boron longeron – the aircraft's "backbone." The B-1, Swift Justice, was damaged during a routine training mission in December 2007. An engine-bleed air duct rupture triggered a temperature warning light, forcing the crew to land the aircraft at Ellsworth Air Force Base, S.D.

Replacing the upper-center boron longeron, which is essential for stability in flight, is not a simple task because the part is unique to each aircraft, with no spares available.

“The boron backbone of the B-1 is an aggressive composite design, even by today’s standards,” said Mahesh Reddy, B-1 program director for Boeing Global Services & Support. “In order to perform the repair, we worked with the Air Force and industry partners to remanufacture the entire part.”

Boeing Integrated Defense Systems and Boeing Commercial Airplanes employees from sites across the company worked together with the Air Force and material vendors to re-create the damaged part. Specialty Materials Inc. in Lowell, Mass., the original boron/epoxy supplier, provided 14,000 feet of 4-inch-wide unidirectional tape to fabricate the longeron. Cytec Engineered Materials Inc., in Tempe, Ariz., supplied the adhesive film and adhesive primer. Due to the part's complexity and 47.5-foot length, the Boeing Composite Fabrication & Assembly Center in Seattle was selected to perform the layup and cure the part in its 90-foot-deep autoclave.

“The return to flight of this B-1 is a perfect example of how Boeing solves issues by applying skills and capabilities from across the company, our suppliers and our customer,” said Reddy.

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Linx (04.30.25)

Aero Linx: Aviators Code Initiative (ACI) Innovative tools advancing aviation safety and offering a vision of excellence for aviators. The ACI materials are for use by aviation pra>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Agile Aero’s Jeff Greason--Disruptive Aerospace Innovations

From 2016 (YouTube Edition): Who You Gonna Call When You Have a Rocket Engine that Needs a Spacecraft? While at EAA AirVenture 2016, ANN CEO and Editor-In-Chief, Jim Campbell, sat >[...]

Aero-News: Quote of the Day (04.30.25)

"In my opinion, if this isn't an excessive fine, I don't know what is... The odds are good that we're gonna be seeking review in the United States Supreme Court. So we gotta muster>[...]

ANN's Daily Aero-Term (04.30.25): Expedite

Expedite Used by ATC when prompt compliance is required to avoid the development of an imminent situation. Expedite climb/descent normally indicates to a pilot that the approximate>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC