NASA Prepares To Move Endeavour To VAB | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Jun 29, 2007

NASA Prepares To Move Endeavour To VAB

Rollover Planned July 2; Launch In August

In preparation for the STS-118 mission to the International Space Station, NASA is scheduled to rollover space shuttle Endeavour from its hanger, the Orbiter Processing Facility, to the Kennedy Space Center's Vehicle Assembly Building on Monday, July 2.

In the Vehicle Assembly Building, crews will mate Endeavour to its external fuel tank and twin solid rocket boosters.

The next milestone for Endeavour is the 3.4-mile rollout to Launch Pad 39A, planned for July 11. Endeavour is targeted for launch in early August -- in fact, on Thursday NASA moved up the target launch date by two days, to August 7, in order to better position the Atlantis launch in between scheduled launches of two unmanned spacecraft from the Cape.

During the 11-day mission to the station, Endeavour's crew of seven astronauts will add the Starboard 5 (S5) segment to the right side of the station's backbone, or truss, as well as deliver 5,000 pounds of supplies and conduct repairs.

The mission will be Endeavour's first flight since the loss of Columbia in February 2003. NASA reports the shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis.

Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab.

FMI: www.nasa.gov/mission_pages/shuttle/main/index.html

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC