Red Tails Performing Maintenance On P-51 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sat, Jan 10, 2015

Red Tails Performing Maintenance On P-51

Some Major Items Discovered To Be In Need Of Repair

The CAF Redtail Squadron got some bad news when its P-51C Mustang Tuskegee Airmen went in for some routine maintenance. The squadron reports on its blog that the airplane is in need of some major work that will ground the airplane until is it repaired.

According to the blog, the  radiator, one of the legs of the landing gear, a piston ring and damage to the aileron cables are all on the docket for repair, along with the Mustang’s regularly-schedule maintenance. Although none of these needs indicate a life-threatening problem to the aircraft, they certainly are very expensive and need to be attended to before it can be flown again.

Tye Halvas and the team at AirCorps Aviation are giving us the inside scoop on the maintenance and repair, and we are going to keep you updated with regular posts and pictures to follow along with the process. Keep your eyes on this blog for updates!

Current work in progress:

Engine – The banks and pistons are at Roush Aviation and will be done the first week of February. Right now they are in the disassembly and inspection process.

Landing gear – The pivot shafts are getting magnafluxed and cadmium plated. They are expected back January 13th. At that point that landing gear will be reassembled, serviced with fluid and nitrogen and installed in the aircraft.

Horizontal stabilizer – The patch has been completed and the paint process is done though primer. As soon as the landing gear is in and the aircraft is back on the ground it will be painted red.

Radiator – The radiator has been cleaned and inspected. Repairs have been made to the solder and the core is currently being tested.

The squadron said it will continue to post updates on the progress of the repairs as they are made.

(Image provided by the CAF. Mechanic Brian Bottolene works to hoist the right bank off of the engine)

FMI: www.redtail.org

Advertisement

More News

Airborne 07.11.25: New FAA Boss, New NASA Boss (Kinda), WB57s Over TX

Also: ANOTHER Illegal Drone, KidVenture Educational Activities, Record Launches, TSA v Shoes The Senate confirmed Bryan Bedford to become the next Administrator of the FAA, in a ne>[...]

Airborne-Flight Training 07.10.25: ATC School, Air Race Classic, Samson School

Also: Sully v Bedford, Embraer Scholarships, NORAD Intercepts 11, GAMA Thankful Middle Georgia State University will be joining the Federal Aviation Administration’s fight ag>[...]

Airborne Affordable Flyers 07.03.25: Sonex HW, BlackShape Gabriel, PRA Fly-In 25

Also: DarkAero Update, Electric Aircraft Symposium, Updated Instructor Guide, OSH Homebuilts Celebrate The long-awaited Sonex High Wing prototype has flown... the Sonex gang tells >[...]

Airborne-Flight Training 07.10.25: ATC School, Air Race Classic, Samson School

Also: Sully v Bedford, Embraer Scholarships, NORAD Intercepts 11, GAMA Thankful Middle Georgia State University will be joining the Federal Aviation Administration’s fight ag>[...]

Rick Kenin New Board Chair of VAI

30-Year USCG Veteran Aviator Focusing On Member Benefits The Vertical Aviation International Board of Directors announced its new leadership officers in April, and all began their >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC