Boeing To Propose Battery Fix To FAA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Feb 22, 2013

Boeing To Propose Battery Fix To FAA

Dreamliners Could Be Flying Again In Two Months, Sources Say

Boeing has an appointment with FAA Administrator Michael Huerta Friday to discuss a possible fix for the battery issues that have kept its Dreamliner airplanes grounded for more than a month. Sources close to the company say that if they are approved, the fleet could be carrying passengers again in two months.

The Associated Press reports that the planemaker believes that adding ceramic insulation between the battery cells and other changes, including a modified venting system, would prevent the batteries from overheating and causing a fire. It is not expected that Huerta will immediately give approval to the re-design, but at least it would be a starting point for a discussion of what standards Boeing will need to meet as it designs and tests the repair before installing it on the affected planes.

But the fix does not get to the root cause of why the batteries overheated in the first place, which has not yet been determined. Boeing's hope is that by proposing a safer design they can get the airplanes back in the air, and start to make inroads on a delivery backlog that is eating away at its cash reserves.

The proposed repairs would also include increasing the spacing between the battery cells, and modifications in the way they are installed in the airplane to reduce the effects of moisture, vibration, or swelling of the cells. It would also include a system to vent any hazardous material to the outside of the airplane, and monitor individual cells rather than the system as a whole.

Boeing thinks it could rebuild the battery systems on planes already in service by the end of March, but there is no guarantee that the FAA will approve the changes that quickly.

(Dreamliner image from file)

FMI: www.faa.gov, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (04.30.25)

Aero Linx: Aviators Code Initiative (ACI) Innovative tools advancing aviation safety and offering a vision of excellence for aviators. The ACI materials are for use by aviation pra>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Agile Aero’s Jeff Greason--Disruptive Aerospace Innovations

From 2016 (YouTube Edition): Who You Gonna Call When You Have a Rocket Engine that Needs a Spacecraft? While at EAA AirVenture 2016, ANN CEO and Editor-In-Chief, Jim Campbell, sat >[...]

Aero-News: Quote of the Day (04.30.25)

"In my opinion, if this isn't an excessive fine, I don't know what is... The odds are good that we're gonna be seeking review in the United States Supreme Court. So we gotta muster>[...]

ANN's Daily Aero-Term (04.30.25): Expedite

Expedite Used by ATC when prompt compliance is required to avoid the development of an imminent situation. Expedite climb/descent normally indicates to a pilot that the approximate>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC