Committee Recommends Building New James City, VA Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Wed, May 27, 2009

Committee Recommends Building New James City, VA Airport

But The New Facility Is A Long Way From Reality

After a year-long feasibility study, the James City Board of Supervisors' Community Airport Committee has recommended that the county build a new airport, rather than buy and operate Williamsburg-Jamestown Airport (pictured below).

The existing airport is privately owned, and does not meet certain FAA standards. That was one of the determining factors in the committees' decision to launch a site selection survey for a new airport. Extensive rehabilitation to Williamsburg-Jamestown Airport would be needed to bring it up to federal aviation standards.

FAA Airport Planner Jeffery Breedon told the The Newport News Daily Press that building a new airport is a lengthy and involved process which doesn't "just happen overnight". The site selection, environmental impact studies, design and layout, and land acquisition could take up to 20 years. And while federal money and state money ... up to 98 percent of the cost of either building a new airport or rehabbing the current one ... is available, the process is competitive, and the FAA can look more favorably on upgrading an existing airport. If no suitable land is found, the state of Virginia would want it's portion of the money back. County Administrator Sandy Wanner pointed out that there "is not a lot of land left in James City County". 

The committee estimated the cost of a new airport at $16 million just to complete the site study, acquire the land, and build a runway. That price tag does not include hangars, buildings, or other facilities. But Williamsburg-Jamestown Airport (JGG) would need extensive upgrades including a wider runway to bring it up to FAA standards, and a nearby landfill is also a problem. Those issues so far have been waived because the airport is privately owned.

The current airport is one like where many of us learned to fly. About 77 airplanes call Williamsburg-Jamestown Airport home, most of them single engine GA aircraft. The single 3200 foot runway handles about 22 thousand operations a year. There is an FBO, a restaurant, fuel, and pilot shop. It was established by Larry and Jean Waltrip in 1970. They have owned and operated it ever since, but Mr. Waltrip has announced his intention to retire.

Committee Chair Tucker Edwards told the Board of Supervisors "The airport is highly valued by the people who use it now".

FMI http://www.williamsburgairport.com

Advertisement

More News

NTSB Prelim: Lee Aviation LLC JA30 SuperStol

A Puff Of Smoke Came Out From The Top Of The Engine Cowling Followed By A Total Loss Of Engine Power On May 9, 2025, about 1020 mountain daylight time, an experimental amateur-buil>[...]

Classic Aero-TV: Curtiss Jenny Build Wows AirVenture Crowds

From 2022 (YouTube Edition): Jenny, I’ve Got Your Number... Among the magnificent antique aircraft on display at EAA’s AirVenture 2022 was a 1918 Curtiss Jenny painstak>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Classic Aero-TV: Quest Kodiak Enhances Migration Monitoring Programs

From 2008 (YouTube Edition): US Fish and Wildlife Service Chooses The Kodiak To Monitor Waterfowl Populations Waterfowl all over North America may soon have to get used to a new ab>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC