Atlantis' Final Scheduled Launch Picture Perfect | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, May 14, 2010

Atlantis' Final Scheduled Launch Picture Perfect

Spacecraft's 32nd Mission Underway On Schedule

Space shuttle Atlantis roared into an azure blue Florida sky at 1420 Friday, the final planned launch of the veteran spacecraft.


File Photo Courtesy NASA

Launch directors expressed some concern during the final planned hold before Friday's launch because of a ball bearing that was discovered in the payload bay of the spacecraft two days earlier. It was determined that it was the same size and type of bearing that is used in camera mounts in Atlantis' payload bay. But that issue was resolved and the flight controllers gave a "go" for an ontime launch.

During the 12-day flight, Atlantis and six astronauts will fly to the International Space Station, leaving behind a Russian Mini Research Module, a set of batteries for the station's truss and dish antenna, along with other replacement parts.

NASA astronaut Ken Ham (below) will command an all-veteran flight crew: Pilot Tony Antonelli, and Mission Specialists Michael Good, Garrett Reisman, Piers Sellers and Steve Bowen.

After the final STS-132 Flight Readiness Review, John Shannon, Space Shuttle Program manager, pointed out that Atlantis' last planned mission will be an exciting one.

"Twelve days, three [spacewalks], tons of robotics... We're putting on spares that make us feel good about the long-term sustainability of the ISS, replacing batteries that have been up there for a while, and docking a Russian-built ISS module," Shannon said. "This flight has a little bit of everything, and it's been a great preparation for the team."

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC