Vita Inclinata Opens 2nd Colorado Location | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Feb 01, 2022

Vita Inclinata Opens 2nd Colorado Location

Manufacturer Expands Production Capabilities for Container Loader/Navigator

Vita Inclinata, developer and manufacturer of helicopter and crane load stabilization and precision hardware, opened its new 13,000 square foot manufacturing facility in Broomfield, Colorado.

The new manufacturing facility will house the company's primary production of the large Vita Load Navigator, a heavy-duty stabilization system for cranes that mount to spreader bars and hoist loads over 25,000 pounds. 

The time for heavy life equipment could be ripe, given the current issues seen throughout the supply chain. Ports and passages formerly uneconomical could see some growth, as vital supplies find it worthwhile to go off the beaten path for lower traffic and faster service. Vita reported strong growth throughout 2021, with an "aggressive product delivery schedule" for its new and updated equipment. The Load Navigator consists of a custom load-size configuration under cranes via attachment to a spreader bar system, allowing more accurate and precise grasping on containers. The company has nearly doubled its headcount over the last year, and their new factory will see their employees swell by another 10-20 personnel. The new factory is the second fabrication facility in Broomfield, with executive offices in Washington, D.C, and the United Arab Emirates.

"The industry demand for our Vita Load Navigator is rapidly increasing and we require this new facility to accelerate its production," said Caleb Carr, Chief Executive Officer, Vita. "This new facility will be a stopgap as Vita works to source a 100,000 sq. ft. manufacturing facility in the year to come."

FMI: www.vitatech.co

Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC