Endeavour Launch Pushed Back Again | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sat, May 07, 2011

Endeavour Launch Pushed Back Again

Earliest STS-134 Launch Date Now May 16

NASA managers have retargeted space shuttle Endeavour's launch to no earlier than Monday, May 16. After a meeting on Friday, they also extended the length of Endeavour's STS-134 mission to the International Space Station from 14 to 16 days. If Endeavour launches on May 16, liftoff would be at 0856 EDT.

At 1500 on Monday, May 9, NASA Space Shuttle Program Launch Integration Manager Mike Moses and Shuttle Launch Director Mike Leinbach will hold a news conference at Kennedy Space Center in Florida to discuss the progress of repairs since Endeavour's launch postponement on April 29.

Kennedy technicians are continuing work to resolve an issue in a heater circuit associated with Endeavour's hydraulic system that resulted in the launch postponement. Technicians determined the failure was inside an aft load control assembly, which is a switchbox in the shuttle's aft compartment, and possibly its associated electrical wiring. Although the root cause of the failure in the switchbox has not been found, technicians are replacing hardware that could have caused the problem. The faulty box was changed Wednesday, and a test of nine shuttle systems powered by the new box is under way.

This weekend, technicians will install and check out new wiring that bypasses the suspect electrical wiring connecting the switchbox to the heaters. They also will run the heaters for up to 30 minutes to verify they are working properly and complete retesting of the other systems powered by the switchbox.

The shuttle has three Auxiliary Power Units (APUs) that provide hydraulic power to steer the vehicle during ascent and entry. The hydrazine fuel lines on each APU have two heater circuits that prevent the fuel from freezing while the shuttle is in space. NASA launch commit criteria and flight rules require all APUs and heater circuits to be operational for launch. On Endeavour's first launch attempt, one of two heaters for APU-1's fuel line did not work. Engineers confirmed the circuit in the original switchbox that directed power to the heaters was shorted out.

Launch attempts are available through May 26. May 21 is the only day a launch is not an option because it would lead to a May 23 docking with the space station. May 23 is when three of the space station's Expedition 27 crew members undock and return home in their Soyuz spacecraft. Managers reviewed the STS-134 mission timeline and determined the Endeavour crew can accomplish all objectives even with the departure of the three station crew members.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC