FAA Extends Repair Station NPRM Comment Period | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Wed, Feb 28, 2007

FAA Extends Repair Station NPRM Comment Period

Comments Must Now Be In By April 16

 Few articles of regulation have spurred as many reactions from the aviation community as the FAA's Notice of Proposed Rulemaking, announced late last year, on amending repair station ratings and quality assessment procedures. From the original proposal's December 1 issue date, it appeared fairly obvious 90 days wouldn't be nearly enough to handle all the comments... and this week, the FAA agreed.

Acting on a request from the Aeronautical Repair Station Association, the FAA has extended the comment period for its Repair Stations NPRM, Docket No. FAA-2006-26408, another 45 days. All comments on the proposal must now be received by April 16, 2007.

As Aero-News reported, under the NPRM a new Avionics Rating would combine the Radio, Instrument, and parts of the accessory ratings into a single rating. The proposed rating would group together items that operate electrically or electronically and that require a unique set of skills not associated with other ratings.

In addition, this rating would allow repair stations to perform maintenance on in-flight entertainment units or other electronic units, as specified in their operations specifications.

In response to industry and ARAC recommendations, the FAA would no longer issue limited ratings. Instead, the FAA would issue limitations to the rating of a certificated repair station governing maintenance or alterations on a particular type of aircraft, powerplant, propeller, avionics, or component part.

The FAA also proposes significant additional changes to include requiring a repair station to maintain a capability list, designating a chief inspector, and having permanent housing for its facilities, equipment, materials, and personnel.

So if these issues matter to you... get your comments in now.

FMI: Read The NPRM (.pdf)

Advertisement

More News

Airborne 05.19.25: Kolb v Tornados, Philippine Mars, Blackhawk Antler Theft

Also: Tentative AirVenture Airshow Lineup, Supersonic Flight Regs, Private Pilot Oral Exam Guide, Boeing Deal The sport aircraft business can be a tough one... especially when Moth>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Term (05.23.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (05.23.25)

“While we are relieved that no one was injured, the destruction of our aircraft will have severe consequences on our operations, and it is a personal blow to our dedicated te>[...]

ANN's Daily Aero-Linx (05.23.25)

Aero Linx: Ercoupe Owners Club We fly an airplane that was the peak of pre-World War II development. It took more than a decade and a half before the features of the Ercoupe were t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC