Northrop Completes First Flight of Its Model 437 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Sep 05, 2024

Northrop Completes First Flight of Its Model 437

Company Toots Their Own Horn After Successful Test

Northrop Grumman announced that their Model 437, or “Vanguard,” completed its first flight on August 29 out of their plant in Palmdale, California. The company took this opportunity to show off its ‘digital ecosystem’ capabilities put to work.

Model 437 is a technology demonstrator flown by the company's subsidiary, Scaled Composites. Its concept was first launched three years ago as a solution to the U.S. Air Force’s “Loyal Wingman” program, which was later renamed Collaborative Combat Aircraft (CCA), and as a possible U.K. F-35 escort. The company’s flight announcement, however, made no mention of the CCA or the aircraft’s future role in the project.

The aircraft was based on Scaled Composites' earlier design, the Model 401 Sierra. It is a “crewed variant of the original concept,” Northrop clarified, and is “powered by a single Pratt & Whitney 535 engine with approximately 3,400 pounds of thrust.” Its payload maxes out at 2,000 pounds with two AIM-120 Advanced Medium Range Air-to-Air Missiles (AMRAAMs), carrying speeds up to Mach 0.85.

Questions have been raised as to why Northrop chose to fly Model 437 crewed. The company omitted the explanation, but it is possible that the pilot was a hands-off supervisor to only be used during flight tests.

The recent project “demonstrated how the company’s fully digital engineering ecosystem reduces engineering rework, accelerates schedule and reduces costs,” Northrop stated. Their digital ecosystem works to fully connect the company with its customers and suppliers to streamline connections during new programs, offering time and cost efficiency.

Scaled later released a statement of their own on the Model 437, commenting that it “leveraged extensive experience in rapid design, fabrication, and test of experimental aircraft” in an overall “uneventful” first flight.

FMI: www.northropgrumman.com, www.scaled.com

Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC