Boeing Says 787-8 Dreamliner Ready For Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Aug 17, 2011

Boeing Says 787-8 Dreamliner Ready For Certification

Announces End Of Flight Test Program For Rolls-Royce-Powered Airplanes

All flight tests required for type certification of the 787-8 Dreamliner with Rolls-Royce engines were completed this weekend, according to Boeing. The all-new jetliner is bringing unprecedented levels of fuel economy, maintenance cost improvements, and environmental sensitivity to the marketplace through the use of new technologies including composites, more-electric systems, advanced aerodynamics and the latest advancements in propulsion.

Final Test Flight Ends At Paine Field

"We are very pleased with the performance of the airplane during the Function & Reliability and Extended Operations testing over the last month," said Scott Fancher, vice president and general manager of the 787 program. "The Dreamliner continues to demonstrate that we will indeed deliver a truly revolutionary airplane that will be a game changer in the marketplace."
 
The final flight occurred Saturday onboard ZA102, the ninth 787 to be built. Capt. Mike Carriker, chief pilot for the 787 program, brought ZA102 back to its home base at Paine Field in Everett at 1358 PDT following a 90 minute flight that originated in Billings, MT. During the flight, the 14-person crew completed simulations of a dispatch with a failed generator and failed fuel flow indication.
 
"When ZA102 returned to Paine Field, it brought back with it the hopes and dreams of the many thousands of men and women of Boeing and our global partners who have worked so long for this day," Fancher said. "Their hard work and commitment to this amazing airplane has been a true inspiration. We look forward to making our first delivery to our good friends at ANA in September."
 
Flight testing continues for 787s with GE engines and for Boeing test points not related to certification.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (11.14.25): Marker Beacon

Marker Beacon An electronic navigation facility transmitting a 75 MHz vertical fan or boneshaped radiation pattern. Marker beacons are identified by their modulation frequency and >[...]

Aero-News: Quote of the Day (11.14.25)

“Aviation is an incredible tool for Samaritan’s Purse. After a disaster strikes, we want people to know why we are bringing life-saving supplies. We want them to know t>[...]

Classic Aero-TV: CiES All-Digital Fuel Senders

From 2024 (YouTube Edition): New Capabilities For Business Aviation CiES Corporation President Scott Philiben walked Aero-News Editor in Chief Jim Campbell through some of what set>[...]

Airborne 11.10.25: Affordable Expo Succeeds, Citation Ascend, Kenai Shuts Down

Also: Duffy Predicts ‘Mass Chaos’, Modern Skies Coalition, More Impacts, Archer Buys Hawthorne With only a few months of preparation—and minimal outside media sup>[...]

NTSB Final Report: Lancair 320

The Experienced Pilot Chose To Operate In Instrument Meteorological Conditions Without An Instrument Flight Rules Clearance Analysis: The airplane was operated on a personal cross->[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC