Boeing Awarded $2.8B For KC-46A Tanker Initial Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Aug 20, 2016

Boeing Awarded $2.8B For KC-46A Tanker Initial Production

First Two Production Lots Will Total 19 Airplanes

The U.S. Air Force awarded Boeing $2.8 billion on Aug. 18 for KC-46A tanker low-rate initial production.

The award includes the first two “production lots” of 7 and 12 planes respectively, as well as spare parts. Including future options, Boeing plans to build a total of 179 of the 767-based refueling aircraft for the Air Force to replace their KC-135 fleet.

“The KC-46 tanker will provide the Air Force unprecedented refueling capabilities, operational flexibility and combat readiness,” said Leanne Caret, Boeing Defense, Space & Security president and CEO. “It’s an important day for the company and program. We’re excited about building low-rate initial production aircraft, and it’s only possible because of the hard work of the joint Boeing-Air Force team.”

This step forward follows a Defense Acquisition Board review and announcement that the KC-46 program completed “Milestone C” -- a set of required ground- and flight-test tests – and is approved for initial production. Those tests included refueling flights with F-16, F/A-18, AV-8B, KC-10, C-17 and A-10 aircraft and a cargo handling demo.

Boeing received an initial contract in 2011 to design and develop the U.S. Air Force’s next-generation tanker aircraft. As part of that contract Boeing built four test aircraft – two configured as 767-2Cs and two as KC-46A tankers. The test aircraft have completed more than 1,000 flight hours to date.

The KC-46A is a multirole tanker that can refuel all allied and coalition military aircraft compatible with international aerial refueling procedures and can carry passengers, cargo and patients.

Boeing is assembling KC-46 aircraft at its Everett, WA facility. The company will begin delivering tankers to the Air Force in 2017.

(Image provided with Boeing news release)

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC