Triumph Extends Long-Term Composite Work Contract With Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, May 03, 2018

Triumph Extends Long-Term Composite Work Contract With Boeing

Supplies Detail And Assembly Parts For Dreamliners

Triumph Group has reached an agreement with Boeing to extend its current long-term agreement to supply composite detail and assembly parts for the Boeing 787 Dreamliner. Under the agreement, Triumph Aerospace Structures’ business based out of Milledgeville, Georgia will continue production of composite parts for the 787, section 47/48 fuselage to be shipped directly to Boeing’s North Charleston, South Carolina facility for integration into the aft body section of the airplane.

“This long-term extension award for composite parts at our Milledgeville site supports our strategic initiative to drive organic growth and build long-term stability for the company,” stated Pete Wick, executive vice president of Triumph Aerospace Structures. “It is also an integral step in further strengthening our partnership with Boeing.”

Since the original contract award in 2009, Triumph has provided composite frame assemblies and details for more than 745 Dreamliner airplanes. Triumph Group provides substantial content for the 787 program spanning cabin insulation, ducting, electric brake actuation, actuation for cargo and landing gear doors, and main and nose landing gear extension, in addition to composite and metal structural components and assemblies.

Triumph’s Milledgeville site serves as the company’s Center of Excellence for composite work and assemblies. Its product lines include acoustic engine nacelles, flight control surfaces and fuselage support structures.

(Source: Triumph Group news release. Image from file)

FMI: www.triumphgroup.com

Advertisement

More News

ANN's Daily Aero-Term (06.30.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

ANN's Daily Aero-Linx (06.30.25)

Aero Linx: Australian Transport Safety Bureau (ATSB) The Australian Transport Safety Bureau (ATSB) improves safety and public confidence in aviation, marine and rail transport thro>[...]

Aero-News: Quote of the Day (06.30.25)

“The Palo Alto stopover confirmed—yet again—that flight schools and aero-clubs are no longer just curious about electric training; they are ready to buy. In just >[...]

NTSB Final Report: ICON A5

Pilot’s Failure To Maintain Clearance From The Water While Flying At A Low Altitude Analysis: The flight of two airplanes was in cruise flight on a north heading about 50 ft >[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC