Ariane Moves Closer To Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.07.24

Airborne-NextGen-10.08.24

Airborne-Unlimited-10.09.24

Airborne-FlightTraining-10.10.24

Airborne-Unlimited-10.11.24

Sun, May 25, 2003

Ariane Moves Closer To Launch

Spacecraft Moved To Final Assembly Building

The Ariane 5 for Flight 161 took one big step closer to liftoff today when it was transferred from the integration building to the final assembly facility at the Spaceport's ELA-3 launch complex.

In a process that began at 10:30 a.m., the Ariane 5 emerged from the integration building atop its mobile launch table - which was pulled by the Spaceport's multipurpose tug.

It covered the 1.3 km. distance to the final assembly building under a bright sun and only partly cloudy skies overhead.

Flight 161's launcher has been in the integration building since April 25, when the vehicle began its assembly process with the erection of the cryogenic core central stage.

In successive steps, the central stage was mated with the two solid boosters, followed by the integration of Ariane 5's vehicle equipment bay and its EPS upper stage.

With Ariane 5 in the final assembly building, the launch campaign now enters the final stage, which includes integration of the dual satellite payload and the payload fairing.

Liftoff of Flight 161 remains on schedule for early June with the Optus and Defence C1 spacecraft for Australia, and BSAT-2c for the Broadcasting Satellite System Corporation (B-SAT) of Japan.

FMI: www.arianespace.com

Advertisement

More News

Airborne 10.11.24: Starship 5!, Boom 5!, NBAA HERO Activation

Also: Flightoberfest Postponed, Navy Honors Carter, SkyAlyne Awards CAE, Spirit Wardrobe War SpaceX’s Starship may launch on its Flight 5 test flight as early as October 13, >[...]

ANN's Daily Aero-Linx (10.09.24)

Aero Linx: E-4B The E-4B "Nightwatch" serves as the National Airborne Operations Center and is a key component of the National Military Command System for the President, the Secret>[...]

ANN's Daily Aero-Term (10.09.24): Ceiling

Ceiling The heights above the earth’s surface of the lowest layer of clouds or obscuring phenomena that is reported as “broken,” “overcast,” or &ldquo>[...]

ANN's Daily Aero-Term (10.10.24): Parallel Runways

Parallel Runways Two or more runways at the same airport whose centerlines are parallel. In addition to runway number, parallel runways are designated as L (left) and R (right) or,>[...]

ANN's Daily Aero-Linx (10.10.24)

Aero Linx: First Flight Society First Flight Society is a non-profit 501(c)3 organization devoted to fostering and promoting a public awareness of and wide-spread interest in the o>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC