Officials Propose New Airport In Livingston Parish, LA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Aug 22, 2012

Officials Propose New Airport In Livingston Parish, LA

New GA Facility 'Highly Feasible' According To Study

Officials in Livingston Parish, LA, are in discussions with state and federal officials about the possibility of constructing an new GA airport in their community.  And out of the box, a study by the consulting firm LJC Poole calls the potential for getting the airport built is "highly feasible."

The newspaper The Advocate reports that a request for the inclusion of the proposed airport in the Louisiana Airport System Plan has been sent in writing to the state by parish president Layton Ricks. The consultant has also contacted the FAA about potential sites for the airfield.

The study shows that the airport could be built on as little as 200 acres, but 500 acres would be the optimal amount of land. The planned 5,400 foot runway would accommodate GA airplanes and some business jets, but not commercial air traffic. The runway is planned for a north-south orientations as prevailing winds are from the south, according to the study.

It is estimated that the project would cost about $12 million, with 90 percent funded through federal AIP and other grants. Parish councilwoman Sonya Collins told the paper that outside funding would be critical to the feasibility of building an airport at this time. Bobby Font, the mayor of Walker, LA, said that the number of airplanes in the parish will make it necessary to build such a facility "at some point" to move the parish forward in terms of development. But "I don't know if that time is now or not," he said.

While there are many hurdles to clear before the first dirt can be turned on the new airport, Ricks said he thinks it would be good for attracting business to the area. “A lot of businesses like the opportunity to fly right in” with key people or important parts, he said.

FMI: www.livingstonparishla.gov, www.faa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC