Final Boeing 747 Dreamlifter On The Job | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Thu, Feb 18, 2010

Final Boeing 747 Dreamlifter On The Job

Largest Cargo Capacity By Volume Of Any Airplane

The fourth Boeing Dreamlifter (registry N718BA) – the final airplane in a fleet of specially modified 747-400s – entered service today. Dreamlifters transport the large composite structures of the 787 Dreamliner from partners around the world to Everett, WA for final assembly.

The unique airplane, which was modified by Evergreen Aviation Technologies Corp. in Taipei, Taiwan, took off from Paine Field in Everett early Tuesday morning. Bound for Wichita, KS, the Dreamlifter is returning the equipment used to transport the forward fuselage section known as section 41.

Boeing says the Dreamlifter is a modified 747-400 passenger airplane that can haul more cargo by volume than any airplane in the world. As the primary means of transporting major assemblies of the Boeing 787 Dreamliner, the Dreamlifter reduces delivery times to as little as one day from as many as 30 days prior to its deployment.

Modifications began for the Dreamlifter in 2005, and it first flew in 2006. The airplane was flight tested, certified, and began service in 2007. Three years later, the fleet of four is complete.

The Dreamlifter can cruise at Mach 0.82, has a cargo capacity of 65,000 cubic feet, and has a maximum takeoff weight of 803,000 pounds. It has been modified with a hinge on the aft section of the fuselage, giving the airplane a swing tail cargo door.

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC