ARINC Direct: Need Help With Those RVSM Applications? | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.07.24

Airborne-NextGen-10.08.24

Airborne-Unlimited-10.09.24

Airborne-FlightTraining-10.10.24

Airborne-Unlimited-10.11.24

Fri, May 30, 2003

ARINC Direct: Need Help With Those RVSM Applications?

ARINC has announced a program that will help corporate aircraft operators assemble the lengthy and detailed applications required for RVSM operational approvals from the FAA. RVSM, or Reduced Vertical Separation Minimum airspace, is expected to go into effect over North America in January, 2005. The FAA is scheduled to sign the rule this summer. Many business aircraft will need RVSM instrument modifications and height monitoring flights, and all aircraft will need operational approvals in order to fly in the new RVSM airspace at or above 29,000 feet. About 6,000 North American business aircraft are affected.

ARINC recently completed the required FAA approval document packages for several height monitoring customers. "This is clearly a much-needed service," states Dave Poltorak, Vice President for ARINC DirectSM Business Aviation Services. "Along with our six years of RVSM experience, it means ARINC Direct offers true one-stop shopping for the RVSM needs of business aviation."

Operational approval for RVSM requires aircraft operators to supply written answers covering 23 FAA "areas." These areas include changes to the airframe, changes in the operating procedures, and re-training of aircrew, maintenance, and line personnel to meet the new demands of RVSM operation.

Answers must be supplied in the required FAA format, addressed to inspectors at the customer's local Flight Standards District Office (FSDO). ARINC personnel attended the FAA's training sessions along with FSDO staffs to learn about the content and format of the approval documents. ARINC Direct charges a flat fee to prepare the document package. "Then we stick with the customer until they obtain operational approval," says Poltorak. "There is no extra charge for our ongoing attention and support."

The company will also prepare approval packages as an outsource service for aircraft manufacturers or modification companies. "We're pricing this important work competitively, as a service to business aviation," Poltorak adds.
 
ARINC Direct maintains a state-of-the-art service facility for business aircraft at Colorado Springs (COS), plus a 24x7 operations center to support business aviation. The company offers RVSM flight monitoring from six locations in the U.S. and Canada, and has performed 3600 RVSM monitoring flights. It also performed RVSM modifications for the FAA's own aircraft.

FMI: www.arinc.com

Advertisement

More News

Aero-News: Quote of the Day (10.13.24)

“Achieving this milestone and ensuring the timely delivery of the first six aircraft required extensive coordination and cooperation among industry partners, PMA-265 and the >[...]

Major Milestone For Hornet Extension Project

Significant Accomplishment For RCAF And PMA-265 Collaboration The Royal Canadian Air Force (RCAF) announced that the CF-18 Hornet Extension Project (HEP) has achieved initial Opera>[...]

PHI Adds Airbus Helicopters Into Service In Australia

Two H175s Will Support Multiple Roles PHI Aviation in Australia has placed two Airbus H175 helicopters into service and will be based out of the company’s Broome location in >[...]

Launch Event Held For New Full Flight Sim In Dubai

Ansett Aviation Opens New Airbus A320 ceo/neo Training Center Ansett Aviation Training held a launch celebration to showcase the opening of its brand new Airbus A320 ceo/neo full f>[...]

Pilot Rescued After Noseover in Inguadona Lake

Man Pulled From the Water and Treated for Minor Injuries On October 8, an Air Tractor AT-802A Fire Boss made a noseover landing while performing a routine proficiency flight over C>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC