AeroMech Announces RVSM for Piper Fury | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Apr 23, 2024

AeroMech Announces RVSM for Piper Fury

Piper's Spiciest Turboprop Gains More Functionality via STC

The latest iteration of the long-lived Malibu platform - now the Matrix and Meridian - cut a pretty impressive figure upon its recent announcement, offering the same single-engine affordability and family hauling capacity of classic Pipers, with a brand-new Pratt & Whitney PT-6A-52.

With better performance than ever before, operators venturing into flight levels may find it a tad irritating to miss out on using Reduced Vertical Separation Minima. Having RVSM equipment and authorization makes planning and flying easier all around, with more tracks and altitude blocks available to aircraft equipped for it. AeroMech Incorporated will offer an RVSM STC for the M700 Fury, just like it offered for previous M-Models like the Meridian, M500, and M600 in years past. The STC allows Fury operators to get the absolute best out of their birds, flying at higher flight levels, saving fuel, lowering carbon, and avoiding weather with increased operational flexibility. Perhaps best of all, they can cruise in the "express lane" at underutilized eflight levels. Like any good, high-quality STC, it adds a little touch of resale, too.

The AeroMech STC ODA will be issued in the third quarter of 2024, in addition to being made available on new production M700 Furies. Those M700 operators who didn't get an RVSM option, as well as those flying the Meridian and M500/600, can conduct an RVSM installation at AeroMech's Orlando and Nashville bases. AeroMech will send out teams for remote installations, too, in case a plane can't make it down south.

FMI: www.aeromechinc.com

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Rutan Long-EZ

The Pilot Attempted Several Times To Restart The Engine And Diverted To Long Beach Airport/Daughtery Field On October 20, 2025, about 1603 Pacific daylight time, an experimental am>[...]

ANN's Daily Aero-Term (12.05.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (12.05.25)

"The latest development underscores the government of Malaysia’s commitment in providing closure to the families affected by this tragedy..." Source: From statements made by >[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC