Kopter: SH09 Back 'Home' After Successful Flight Tests In Pozzallo | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Thu, Sep 17, 2020

Kopter: SH09 Back 'Home' After Successful Flight Tests In Pozzallo

Next Test Priorities Will Explore Capabilities Of The New Tail Rotor And Recent Aerodynamic Mods

Since the resumption of the test flight activities in June in Pozzallo, Sicily, Kopter's third prototype (P3) has completed 40 flights, allowing testing of multiple aerodynamic modifications and configurations. The current configuration fitted on P3 has seen a significant improvement in smoothness and stability.

Recent upgrades include an engine cowling extension for improved aerodynamics, a variable asymmetric tail plane at the best available incidence, the removal of the end plates and a larger upper vertical fin improving stability.

Richard Grant, Kopter Chief Test Pilot, commented: “P3 returns to Mollis a very different aircraft. The changes that have been implemented this year have made a real improvement to the handling of the aircraft. Now we are able to further expand the envelope and start to realize the aircraft’s true potential”

This most recent block of flight tests has been the most productive in terms of the number of modifications assessed and the general improvements realized. Early analysis and observations confirm the validity of the new design concepts. This achievement is a result of the work of all teams involved, utilizing the analysis and feedback from all the previous flight test blocks of P3. The SH09 is more and more reaching the planned overall performance and capabilities as development moves ahead.

For the next chapter in the SH09 evolution, P3 is back to the home facility in Mollis where upcoming upgrades require a strong support from the Engineering and Operations teams.

On return to Mollis, the test priorities are to explore the capabilities of the new tail rotor and the recent aerodynamic modifications throughout the low speed envelope and the upgrade to the final main rotor head and flight controls.

FMI: https://koptergroup.com/

Advertisement

More News

Airborne 07.11.25: New FAA Boss, New NASA Boss (Kinda), WB57s Over TX

Also: ANOTHER Illegal Drone, KidVenture Educational Activities, Record Launches, TSA v Shoes The Senate confirmed Bryan Bedford to become the next Administrator of the FAA, in a ne>[...]

Airborne-Flight Training 07.10.25: ATC School, Air Race Classic, Samson School

Also: Sully v Bedford, Embraer Scholarships, NORAD Intercepts 11, GAMA Thankful Middle Georgia State University will be joining the Federal Aviation Administration’s fight ag>[...]

Airborne Affordable Flyers 07.03.25: Sonex HW, BlackShape Gabriel, PRA Fly-In 25

Also: DarkAero Update, Electric Aircraft Symposium, Updated Instructor Guide, OSH Homebuilts Celebrate The long-awaited Sonex High Wing prototype has flown... the Sonex gang tells >[...]

Airborne-Flight Training 07.10.25: ATC School, Air Race Classic, Samson School

Also: Sully v Bedford, Embraer Scholarships, NORAD Intercepts 11, GAMA Thankful Middle Georgia State University will be joining the Federal Aviation Administration’s fight ag>[...]

Rick Kenin New Board Chair of VAI

30-Year USCG Veteran Aviator Focusing On Member Benefits The Vertical Aviation International Board of Directors announced its new leadership officers in April, and all began their >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC