Why Did NASA Push So Hard? | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-08.25.25

Airborne-NextGen-08.26.25

AirborneUnlimited-08.27.25

Airborne-AffordableFlyers-08.28.25

AirborneUnlimited-08.22.25

Thu, Jul 14, 2005

Why Did NASA Push So Hard?

Day After Launch Scrub, Space Agency Criticized For Speeding Preps

With the shuttle program under the world's microscope as it returns to flight, why did NASA engineers start the countdown without checking the external fuel tank’s sensors? Those sensors were already pegged as problematic when NASA delayed the launch in April. The answer: engineers said they were comfortable that the issue was nothing more than an “unexplained anomaly.”

"We became comfortable as a group, as a management team, that this was an acceptable posture to go fly in," deputy shuttle program manager Wayne Hale said, quoted by the Associated Press, "and we also knew that if something were to happen during a launch countdown, we would do this test and we would find it. And guess what? We did the test, we found something and we stopped. We took no risk. We're not flying with this."

The fuel depletion sensor failure that stopped Wednesday’s launch was one of two issues that caused NASA officials some measure of embarrassment during the launch scrub. Earlier, a plastic windowpane simply fell out of the space vehicle, damaging some of Discovery’s sensitive thermal tiles.

Discovery will not launch until at least Saturday -- a delay that could run much longer. At this point, it’s not clear whether the shuttle can be repaired on the pad or will have to be returned to the Vehicle Assembly Building.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (08.27.25)

Aero Linx: The American Society of Aerospace Medicine Specialists (ASAMS) The Society is a non-profit organization created to serve as a voice for and represent the professional ne>[...]

ANN's Daily Aero-Term (08.27.25): Class C Service

Class C Service This service provides, in addition to basic radar service, approved separation between IFR and VFR aircraft, and sequencing of VFR aircraft, and sequencing of VFR a>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Airborne-NextGen 08.26.25: Iran UAV Knockoffs, X-37B Spaceplane, Army Training

Also: ERAU Uses UAVs, P550 Group 2 UAS, Starship’s Florida Launches, NASA Missions Chopped The Air Force has put out a call to commission a one-to-one copy of the Iranian-des>[...]

Classic Klyde Morris (08.25.25)

Classic Klyde Morris From 11.07.16 (and Remembering Bob...) FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC