L-3 Completes First Phase Of F/A-18C/D Roadmap Procurement Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Aug 28, 2009

L-3 Completes First Phase Of F/A-18C/D Roadmap Procurement Program

Six Trainers Delivered To USMC, Simulators Upgraded

L-3 Link Simulation & Training (L-3 Link) announced Thursday it has successfully completed the first phase of the U.S. Navy's F/A-18C/D Roadmap Procurement Program (RPP).

L-3 Link received this two-phase, five-year program in 2006. Under the first phase of the program L-3 Link has delivered six new F/A-18C/D Tactical Operational Flights Trainers (TOFTs). In addition, 16 existing U.S. Navy and U.S. Marine Corps F/A-18 simulators have been upgraded to the new F/A-18C/D TOFT configuration.

The new F/A-18C/D TOFTs and upgraded simulators have been integrated with new photo texture databases to increase visual acuity, additional audio capabilities, increased malfunctions and enhanced instructor operator station functionality. Numerous aircraft concurrency upgrades have been integrated on the F/A-18C/D TOFTs to provide each simulator with the platform's latest aircraft capabilities.

"Our dedicated U.S. Navy and L-3 Link team has worked to ensure training device concurrency with the fleet aircraft," said Frank Casano, director of Maritime Programs for L-3 Link. "This high level of cooperation is benefitting U.S. Navy and U.S. Marine Corps pilots today by enabling them to practice essential training and readiness tasks in the simulator before undertaking a mission in an aircraft."

Link F/A 18 Simulator

L-3 Link has begun work on phase two of the program, which calls for delivery of one additional  F/A-18C/D TOFT each to Marine Corps Air Station (MCAS) Iwakuni, Japan; MCAS Miramar, CA.; and the Joint Reserve Base in Fort Worth, Texas. Phase two also will focus on ensuring the training devices remain concurrent with the aircraft, developing additional visual system databases, inserting new training technologies and making improvements in aerodynamic fidelity. These updates will be deployed to all F/A-18C/D training devices in the U.S. Navy and Marine Corps fleet.

FMI: www.L-3com.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC