Enstrom: TH-180 Flight Test Program Delayed Only Slightly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Mar 02, 2016

Enstrom: TH-180 Flight Test Program Delayed Only Slightly

Second Flight Test Aircraft Is Nearing Completion

Enstrom says that the hard landing experienced by its prototype TH-180 helicopter on February 12th will force only a minimal delay in the certification of the aircraft.

The prototype TH-180 Enstrom Helicopter N180TH experienced a mechanical problem and made a forced landing in February. During the landing, the rotor struck a wooden utility pole, cutting off the pole and destroying the main rotor blades. The pilot, the only person on board, was uninjured. Preliminary investigation indicates that a piece of flight test instrumentation in the main drive system failed, disconnecting the engine from the drive train. Enstrom believes this accident demonstrated the ruggedness of the design and the ability of the aircraft to protect the occupants.

“Enstrom’s second TH-180 flight test vehicle was already in production and we are working on completion ahead of the original schedule," said William Taylor, Co-Program Manager of the TH180 program. "This aircraft is expected to begin flying in April or May timeframe. By rearranging our certification flight test schedule, we anticipate this accident will cause only a minimal delay for the program.”

(Source: Enstrom news release. Image from file)

FMI: www.enstromhelicopter.com


Advertisement

More News

ANN's Daily Aero-Linx (04.30.25)

Aero Linx: Aviators Code Initiative (ACI) Innovative tools advancing aviation safety and offering a vision of excellence for aviators. The ACI materials are for use by aviation pra>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Agile Aero’s Jeff Greason--Disruptive Aerospace Innovations

From 2016 (YouTube Edition): Who You Gonna Call When You Have a Rocket Engine that Needs a Spacecraft? While at EAA AirVenture 2016, ANN CEO and Editor-In-Chief, Jim Campbell, sat >[...]

Aero-News: Quote of the Day (04.30.25)

"In my opinion, if this isn't an excessive fine, I don't know what is... The odds are good that we're gonna be seeking review in the United States Supreme Court. So we gotta muster>[...]

ANN's Daily Aero-Term (04.30.25): Expedite

Expedite Used by ATC when prompt compliance is required to avoid the development of an imminent situation. Expedite climb/descent normally indicates to a pilot that the approximate>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC