Avcorp Awarded $27.4 Million In Arbitration | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Nov 20, 2012

Avcorp Awarded $27.4 Million In Arbitration

Payments Associated With Loss Of Work Being Performed For Cessna

An arbitration panel has found in favor of Avcorp Industries in a reimbursement dispute with Cessna, and will require the Wichita planemaker to pay the airframe component manufacturer some $27.4 million.

Avcorp received the determination of an appointed arbitration panel which was charged with resolving outstanding issues relating to cost reimbursements and compensation payable to the company in connection with the transition of Cessna Aircraft Company ("Cessna") production work back to Cessna and other suppliers. The transition of Cessna production work was first announced by the Company on December 17, 2010 and immediately following notification by Cessna, the Company had attempted to negotiate compensation payments as contemplated by the Cessna Strategic Alliance Agreement (the "SAA"). Only when negotiations and mediation were unsuccessful did the Company refer the matter to binding arbitration.

The binding arbitration award, which was delivered to the Company on November 16, 2012, determined that the SAA was an exclusive agreement between Cessna and Avcorp, and Cessna could not unilaterally transition production work from Avcorp. The panel further found that Avcorp had fulfilled the requirements of the SAA, and suffered damages as a result of Cessna transitioning production work from Avcorp.

In addition, all counterclaims that were advanced by Cessna were denied. The quantum of damages was assessed by the arbitration panel at USD 27,391,372, which amount is payable to Avcorp within 30 days of the arbitration award.

FMI: www.avcorp.com

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC