End Of The Line For 717? | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Sun, Mar 07, 2004

End Of The Line For 717?

Boeing May Shut Down Production

A quick read of the economic tea leaves shows Boeing may well be on the way toward dumping its 717 and shutting down production of the aircraft at its Long Beach (CA) plant.

The program has been in trouble for well over a year now. In 2001, Boeing delivered 49 of the Last year, the company delivered just 13.

"When people stop buying them (717s), we will shut it down. There are ongoing campaigns. If those are successful, it will continue on. I'm not trying to be flip or glib about it at all," Boeing's new CEO Harry Stonecipher said during a review of Boeing's 2003 full-year performance and fourth quarter reports.

A new Securities and Exchange report from Boeing indicates that could be just what's in the works now. The company wants a one-time $400 million charge off on its sales campaign for the 717, which could signal an end to its marketing efforts.

"Program continuity is dependent on the outcomes of current sales campaigns," the Boeing SEC filing says.

"The 717 has been on borrowed time for years," said Richard Aboulafia, with The Teal Group in Fairfax (VA). "It's not the plane's fault. The plane is excellent."

But it faces stiff competition from less expensive aircraft that offer most of the 717's advantages. Most notably, Air Canada last year decided to go with regional jets rather than the smallest commercial aircraft made by Boeing.

The possibility that Boeing might drop its 717 production line has some 14,000 workers in Long Beach on pins and needles. While the same plant manufactures the C-17 military transport, the commercial operations at Long Beach could be drastically curtailed if the aircraft's production cycle is abruptly ended.

It's not like the 717 hasn't been struggling. Boeing almost dropped the program more than two years ago, after the 9/11 attacks severely curtailed air travel worldwide. Boeing has recently tried to revamp the small jetliner by offering a business class version.

Still, the 717 has its supporters. AirTran recently conducted an economic impact analysis, determining the 717 could be operated more efficiently than its Air Wisconsin-owned JetConnect service, which features regional jets. AirTran will phase out its JetConnect operation starting in July. The 14 cities now served by Air Wisconsin RJs will then be served by AirTran 717s.

AirTran is Boeing's biggest 717 customer. It recently ordered 10 more of the small jets, along with 100 737s.

FMI: www.boeing.com

Advertisement

More News

Airborne-NextGen 11.04.25: Anduril YFQ-44A, Merlin SOI 2, UAV Rulemaking Stalled

Also: Horizon Picks P&W PT6A, Army Buys 3 EagleNXT, First Hybrid-Electric Regional, Army Selects AEVEX Anduril Industries’ YFQ-44A Collaborative Combat Aircraft was flown>[...]

NTSB Prelim: Elmore Travis C Searey

While Flying North Along The Beach At About 300 Ft Above Ground Level, The Pilot Reported That The Engine RPM Dropped To About Idle On September 28, 2025, at 1126 eastern daylight >[...]

ANN's Daily Aero-Linx (11.03.25)

Aero Linx: European Association of Aviation Training and Educational Organisations (EATEO) Welcome to the “ European Association of Aviation Training and Education Organizati>[...]

ANN's Daily Aero-Term (11.03.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (11.03.25)

“It also gives us the hard data we need to shape requirements, reduce risk, and ensure the CCA program delivers combat capability on a pace and scale that keeps us ahead of t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC