AD Requires Cycling Of Power On Dreamliners | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sat, Dec 03, 2016

AD Requires Cycling Of Power On Dreamliners

FCMs Could Reset During Flight If Left On More Than 22 Consecutive Days

An Airworthiness Directive published in the Federal Register Friday requires repetitive cycling of either the airplane electrical power or the power to the three flight control modules (FCMs). This AD was prompted by a report indicating that all three FCMs might simultaneously reset if continuously powered on for 22 days on all Boeing 787-8 and 787-9 airplanes.

According to the FAA, reports have been received indicating that an FCM will reset if continuously powered on for 22 days. This condition, if not corrected, could result in simultaneous resets of all three FCMs, which could result in flight control surfaces not moving in response to flight crew inputs for a short time and consequent temporary loss of controllability.

The FAA is requiring compliance with the AD by all 99 Dreamliners registered to U.S. operators within a week.

The FAA considers this AD interim action. Boeing and its suppliers are developing a terminating solution to address the identified unsafe condition. Once this terminating solution is developed, approved, and available, the agency might consider additional rulemaking, according to the published AD.

The Seattle Times reports that in a statement, Boeing said that the AD addresses an issue that it has already been brought to the attention of Dreamliner operators. The company says a permanent software fix "is anticipated in the second quarter of 2017."

An aviation analyst who requested anonymity told the paper that airlines almost never leave a jet powered on for longer than a week.

The FAA estimates that the cost of cycling the power on the airplanes will cost about $85 per airplane per cycle.

(Image from file)

FMI: AD

Advertisement

More News

Airborne 07.11.25: New FAA Boss, New NASA Boss (Kinda), WB57s Over TX

Also: ANOTHER Illegal Drone, KidVenture Educational Activities, Record Launches, TSA v Shoes The Senate confirmed Bryan Bedford to become the next Administrator of the FAA, in a ne>[...]

Airborne-Flight Training 07.10.25: ATC School, Air Race Classic, Samson School

Also: Sully v Bedford, Embraer Scholarships, NORAD Intercepts 11, GAMA Thankful Middle Georgia State University will be joining the Federal Aviation Administration’s fight ag>[...]

Airborne Affordable Flyers 07.03.25: Sonex HW, BlackShape Gabriel, PRA Fly-In 25

Also: DarkAero Update, Electric Aircraft Symposium, Updated Instructor Guide, OSH Homebuilts Celebrate The long-awaited Sonex High Wing prototype has flown... the Sonex gang tells >[...]

Airborne-Flight Training 07.10.25: ATC School, Air Race Classic, Samson School

Also: Sully v Bedford, Embraer Scholarships, NORAD Intercepts 11, GAMA Thankful Middle Georgia State University will be joining the Federal Aviation Administration’s fight ag>[...]

Rick Kenin New Board Chair of VAI

30-Year USCG Veteran Aviator Focusing On Member Benefits The Vertical Aviation International Board of Directors announced its new leadership officers in April, and all began their >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC