Boeing 787-9 Dreamliner Visits New Zealand | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Wed, Jan 08, 2014

Boeing 787-9 Dreamliner Visits New Zealand

Makes International Debut In Country Of Launch Customer

Boeing has flown the 787-9 Dreamliner to Auckland, home of launch customer Air New Zealand, marking the 787-9's international debut and longest flight since the robust test program began.

The second of three 787-9s dedicated to the flight-test program, ZB002 flew direct from Seattle's Boeing Field to Auckland International Airport, departing January 3 at 9:55 a.m. local time and landing (shown here) some 13 hours, 49 minutes later. The airplane is scheduled to continue on to Alice Springs, Australia, for testing in hot weather.

The 787-9 will complement and extend the 787 family. With the fuselage stretched by 20 feet over the 787-8, the 787-9 will fly up to 40 more passengers an additional 300 nautical miles with the same exceptional environmental performance — 20 percent less fuel use and 20 percent fewer emissions than similarly sized aircraft. The 787-9 leverages the visionary design of the 787-8, offering passengers features such as large windows, large stow bins, modern LED lighting, higher humidity, a lower cabin altitude, cleaner air and a smoother ride.

Boeing is on track to deliver the 787-9 to launch customer Air New Zealand in mid-2014. Twenty-six customers from around the world have ordered 402 787-9s, accounting for 39 percent of all 787 orders.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC