NASA Begins Repairs To Leaky Seal Onboard Discovery | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.02.25

Airborne-NextGen-06.03.25

AirborneUnlimited-06.04.25

Airborne-AffordableFlyers-06.05.25

AirborneUnlimited-06.06.25

Wed, Sep 19, 2007

NASA Begins Repairs To Leaky Seal Onboard Discovery

Work Could Delay Launch Next Month

NASA tells ANN repair work is underway on a leaking hydraulic seal in space shuttle Discovery’s right main-gear strut. The struts act as shock absorbers during the shuttle's landing.

Shuttle managers made the decision to go ahead with the repairs during a meeting Monday afternoon.

Discovery had been scheduled to roll over Wednesday from its processing hanger to the Vehicle Assembly Building. There it will be attached to its external fuel tank and two solid rocket boosters for its upcoming mission, STS-120, to the International Space Station.

A new rollover date will be set after technicians determine what needs to be fixed and how long that will take. To remove the main landing gear strut and replace seals requires disconnecting and replacing the brakes and tires, disconnecting and reconnecting instruments and other requirements to allow access to the strut.

Managers will assess the ongoing repair work to decide how it might affect Discovery’s October 23 target launch date.

At the same meeting, managers also officially decided to add an additional spacewalk, bringing the total to five. On the extra spacewalk, as ANN reported, Missions Specialists Scott Parazynski and Douglas Wheelock will test tile heat shield repair techniques, extending the mission to 14 days.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (06.02.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

ANN's Daily Aero-Linx (06.02.25)

Aero Linx: Airpower Museum The APM owns 30 acres on Antique Airfield, including the south half of the N-S runway. It consists of three hangars, an annex, and a library. The museum >[...]

NTSB Prelim: Champion 7ECA

Patient Told The First Responders That The “Man Who Was In The Plane Was Flying At The Time Of The Accident And Had Overshot The Runway They Were Attempting To Land On.&rdquo>[...]

Classic Klyde Morris (From 06.10.22)

Klyde Just Can't Believe This Has Gotten To This Point... FMI: www.klydemorris.com>[...]

Airborne 05.30.25: Anti-Helicopter Bill, PW Strike Done, All-Electric Bristell

Also: Duffy Wants $$$, KS Airports, Morningside U’s Aviation School, New Airstrip In ID After 6 were killed in a helicopter crash over the Hudson River, several US Representa>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC