Clock Ticking On Sprint-LightSquared Deal | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jan 03, 2012

Clock Ticking On Sprint-LightSquared Deal

Extension Granted To Finalize A 15-Year Agreement Between The Two Companies

That sense of urgency that came through in the latest filing by LightSquared with the FCC asking that it expedite approval of plan to build a 4G wireless data network may stem at least in part from a deadline imposed by Sprint Nextel Corp, which had agreed to share network expansion and equipment costs over the next 15 years.

But the deal was predicated on the FCC granting LightSquared permission to use the spectrum, and the original deadline on the agreement was December 31st. With that date now past, Dow Jones Newswires reports that Sprint has granted a 30 day extension for LightSquared to get the required approvals so that construction of the broadband infrastructure can get underway.

In it's filing, LightSquared asked the FCC to rule that the interference issue with existing GPS receivers was entirely the responsibility of the GPS industry, which LightSquared said had sold non-compliant receivers to the public. The company has come under fire from Congress and the Defense Department as well as the industry for planning to build a system that would render millions of deployed devices crippled or useless without retrofit filters.

LightSquared says that the strategic alliance with Spring will save the company $13 billion over the next 8 years, but that it will still need to identify an additional $3.5 billion in funding to realize a positive cash flow by 2014.

FMI: www.lightsquared.com, www.sprint.com, www.fcc.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC