Hostage, Gunman Dead Following Standoff At NASA Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Sat, Apr 21, 2007

Hostage, Gunman Dead Following Standoff At NASA Facility

Contract Worker Employed At Agency For Approx. 13 Years

Police haven't said publicly yet what may have led a contract worker to take hostages inside Building 44 at Johnson Space Center in Houston, TX Friday, in a standoff that ended with the fatal shooting of one hostage and the apparent suicide of the gunman.

Authorities did tell the Associated Press they believe the slain hostage, David Beverly, was killed early in the violent, three-hour ordeal. A second hostage, identified as Fran Crenshaw, was not harmed.

“I don’t know what any of the relations were at this time,” Houston police Capt. Dwayne Ready said of the three persons involved in the incident. “I am sure we will learn if there were any relationships, and what they may have been.”

The gunman, Bill Phillips, was felled by a gunshot wound to the head that appeared to be self-inflicted. No note was found on Phillips' body, and police searched his house Friday for additional clues.

JSC security officials were called to the scene at 1340 local time Friday, on reports of two shots fired inside the building that houses communications and tracking equipment. When it became clear a hostage situation was unfolding, the FBI and SWAT teams were called in, along with local police.

A police spokesman said contact between officers and the gunman was never established.

The Times reports Phillips was employed with NASA contractor Jacobs Sverdrup, a subcontractor for Johnson Space Center. Phillips had worked for NASA for 12-13 years, the agency said in a release Friday night.

NASA spokeswoman Eileen Hawley suggested the incident would lead to a review of security policies at the facility.

FMI: www.nasa.gov

Advertisement

More News

Airborne-NextGen 11.04.25: Anduril YFQ-44A, Merlin SOI 2, UAV Rulemaking Stalled

Also: Horizon Picks P&W PT6A, Army Buys 3 EagleNXT, First Hybrid-Electric Regional, Army Selects AEVEX Anduril Industries’ YFQ-44A Collaborative Combat Aircraft was flown>[...]

NTSB Prelim: Elmore Travis C Searey

While Flying North Along The Beach At About 300 Ft Above Ground Level, The Pilot Reported That The Engine RPM Dropped To About Idle On September 28, 2025, at 1126 eastern daylight >[...]

ANN's Daily Aero-Linx (11.03.25)

Aero Linx: European Association of Aviation Training and Educational Organisations (EATEO) Welcome to the “ European Association of Aviation Training and Education Organizati>[...]

ANN's Daily Aero-Term (11.03.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (11.03.25)

“It also gives us the hard data we need to shape requirements, reduce risk, and ensure the CCA program delivers combat capability on a pace and scale that keeps us ahead of t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC