NASA Updates Shuttle Target Launch Dates For Final Two Flights | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jul 03, 2010

NASA Updates Shuttle Target Launch Dates For Final Two Flights

Program Has Been Extended Through February 2011

NASA is now targeting approximately 1633 EDT on Nov. 1 for the launch of space shuttle Discovery's STS-133 mission, and 1619 EST on Feb. 26, 2011, for the liftoff of shuttle Endeavour's STS-134 flight from the Kennedy Space Center in Florida.

The target dates were adjusted because critical payload hardware for STS-133 will not be ready in time to support the previously planned Sept. 16 launch. With STS-133 moving to November, STS-134 cannot fly as planned, so the next available launch window is in February 2011. NASA will schedule the official launch date for each mission following the agency's Flight Readiness Reviews, which typically occur about two weeks prior to launches.

Meanwhile, Discovery's three main engines have been installed ahead of the launch of the STS-133 mission later this year. A turbopump on one of the engines had to be replaced, and that work required pulling all three main engines from the orbiter. Workers at Orbiter Processing Facility-3 at NASA's Kennedy Space Center in Florida will spend the weekend securing the engines and testing the main propulsion system. The astronauts who will fly Discovery to the International Space Station have a day off from training.

FMI: www.nasa.gov/shuttle

Advertisement

More News

Classic Aero-TV: Mayman Aerospace Speeder Dazzles Oshkosh Crowds

From 2023 (YouTube Edition): A Moniker Well-Chosen Founded in 2021 by serial entrepreneur David Mayman and headquartered in New York City, Mayman Aerospace is the designer and manu>[...]

NTSB Prelim: Socata TBM 700

The Controller Provided The Pilot With A Low Altitude Alert And The Altimeter Setting That Was Current At The Time On October 13, 2025, at about 0815 eastern daylight time, a Socat>[...]

ANN's Daily Aero-Term (11.11.25): Outer Marker

Outer Marker A marker beacon at or near the glideslope intercept altitude of an ILS approach. It is keyed to transmit two dashes per second on a 400 Hz tone, which is received aura>[...]

ANN's Daily Aero-Linx (11.11.25)

Aero Linx: Seaplane Pilots Association The Seaplane Pilots Association is the only organization in the world solely focused on representing the interests of seaplane pilots, owners>[...]

Aero-News: Quote of the Day (11.11.25)

“While business aviation is fully included in the FAA’s traffic reductions, we know that our sector will continue to pursue mandatory and voluntary means to ensure we a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC