Airlander 10 Prototype Will Not Be Rebuilt | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Jan 16, 2019

Airlander 10 Prototype Will Not Be Rebuilt

Company Will Focus On 'Production-Ready' Aircraft Going Forward

Hybrid Air Vehicles will not be rebuilding the prototype Airlander 10 airship after six flights and two incidents.

The 302-foot long aircraft was slightly damaged in 2016 on its second flight when it bumped into the ground during a landing attempt. In 2017, the hull of the prototype automatically deflated as designed when it came loose from its moorings, sending a female employee of the company to the hospital. The damage was considered "very significant" and HAV's insurer agreed to pay about $26 million, which was well below the $41 million HAV told its shareholders was the "maximum insured value" of the aircraft.

That second incident led the company to drop its plans to use the prototype as a "test bed and sales demonstrator," according to a report from The Guardian newspaper. Instead, the company will be focusing on developing a "production ready" variant of the aircraft following the grant of Production Organisation Approval from the CAA. HAV says the POA places it in a "strong position" to launch production and it hopes to have a new Airlander flying in the early 2020s.

HAV said that the prototype had done its job, successfully completing final testing and providing reams of data that will help in the development of the production aircraft.

(Image from file)

FMI: Source report

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC