G250 Integration Test Facility Marks 1,000 Hours Of Software Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Sep 06, 2010

G250 Integration Test Facility Marks 1,000 Hours Of Software Testing

Facility Allows For Avionics And Electronics Analysis

Gulfstream's G250 Integration Test Facility (ITF) has accumulated 1,000 hours of testing on the PlaneView250 software load that will be the basis for securing the aircraft's initial Type Certificate. Gulfstream reached the milestone just four months after evaluation of the Rockwell Collins-provided software began. Rockwell Collins is a strategic partner on the PlaneView250 flight deck, which features Pro Line Fusion avionics.


G250 ITF Cockpit

"The cockpit of the G250 is going to lead the industry," said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. "This test facility is a critical step in bringing this aircraft to market, because it allows us to integrate, test and make adjustments on the ground."

The G250 facility is the first mid-cabin ITF for Gulfstream. The company initiated the ITF concept with the large-cabin GV and developed similar facilities for the G450 and G550. Those facilities, located with the G250 ITF at the company's headquarters in Savannah, are still in use today.

"It's been a great tool," said Mark Kohler, G250 program director, Gulfstream. "It allows us to do the testing in a very safe environment and at a much quicker pace. That's the significance, to be able to accelerate the development effort and ensure the end product exceeds customers' expectations."


G250 First Flight

The G250 ITF was initially powered on November 20th, 2007, and had its first simulated flight on July 7th, 2008. The facility allows engineers to perform a thorough analysis of the aircraft's avionics and electronics to ensure they meet the certification requirements. The facility is also ideal for human-factors analysis, allowing certification authorities to make and test changes on the ground before applying them to the actual aircraft.

In addition to testing, Gulfstream utilizes the ITF to demonstrate the aircraft's capabilities to the Gulfstream Customer Advisory Board (CAB) and potential customers. CAB participants are Gulfstream operators who provide input on aircraft in development and feedback on services the company offers.

FMI: www.gulfstream.com

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC