Boeing Completes First Wedgetail Aerial Refuelings | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jan 20, 2009

Boeing Completes First Wedgetail Aerial Refuelings

First Time A 737 Has Been Fueled In-Flight

Boeing recently announced some much-needed good news regarding its delayed 737 "Wedgetail" program for Australia's air force. The company has completed the first aerial refuelings of the platform.

Flying at 25,000 feet above Edwards Air Force Base, CA on January 7, Boeing pilot Ron Johnston maneuvered the 737-700 AEW&C aircraft into a US Air Force KC-10 tanker's refueling boom envelope and maintained its position below the tanker. The 737 received approximately 14,000 pounds of fuel during two connections with the tanker.

"The aircraft was stable, with excellent flying qualities and engine response behind the tanker," said Johnston.

The historic flights -- the first-ever inflight refueling of a 737-based plane -- were conducted for Project Wedgetail, Australia's airborne early warning and control (AEW&C) program. The aircraft achieved another aerial-refueling first on January 10, when it received fuel from an Air Force KC-135 tanker.

"The 737 AEW&C aircraft's highly automated and efficient refueling system worked flawlessly in both tests," said Maureen Dougherty, AEW&C Program vice president for Boeing. "This is a key milestone in certifying the AEW&C system.

"Air-to-air refueling is a force multiplier for the AEW&C aircraft," Dougherty added, "allowing it to stay on station for significantly longer periods of time while providing critical battle-management and surveillance capabilities."

Project Wedgetail includes six 737 AEW&C aircraft plus ground support segments for mission crew training, mission support and system. ANN reported in November 2008 that Boeing has announced Australia won't see its first modified plane until later this year... three years behind schedule.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC