Discovery Repair Work Continuing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jan 11, 2011

Discovery Repair Work Continuing

Initial Fixes Finished By Tuesday, But Additional Work May Be Required

Technicians at NASA's Kennedy Space Center continue to repair cracks on space shuttle Discovery's external fuel tank in the Vehicle Assembly Building. Repair work will continue through Tuesday.

The shuttle program also reviewed the plan to modify as many as 32 additional stringers with radius blocks, which will provide added structural support in areas known to carry much of the structural load of the external tank. These radius blocks essentially fit over existing stringer edges through which the securing rivets are installed to provide additional structural support. The radius block modification is a known and practiced structural augmentation technique used extensively on the intertank. This work should begin as soon as the repairs to the three stringers with the four additional small cracks have been completed, likely in the next day or so, and the modification of the additional 32 stringers is expected to be complete next week.

NASA managers met with Space Shuttle Program officials Monday to review the progress to date and the forward plan. A determination of the need and viability for the installation of additional radius blocks on all remaining stringers will be made sometime this week.

NASA managers are evaluating potential launch dates for space shuttle Discovery in late February and working to see if International Space Station on orbit operations would allow a launch as early as Feb. 24. Managers hope to set a launch date by the end of this week.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (12.19.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

NTSB Prelim: Cirrus Design Corp SR22T

During The 7 Second Descent, There Was Another TAWS Alert At Which Time The Engine Remained At Full Power On October 24, 2025 at 2115 mountain daylight time, a Cirrus SR22T, N740TS>[...]

Classic Aero-TV: The Red Tail Project--Carrying the Torch of the Tuskegee Airmen

From 2009 (YouTube Edition): Educational Organization Aims to Inspire by Sharing Tuskegee Story Founding leader Don Hinz summarized the Red Tail Project’s mission in simple, >[...]

Aero-News: Quote of the Day (12.19.25)

“This feels like an important step since space travel for people with disabilities is still in its very early days... I’m so thankful and hope it inspires a change in m>[...]

Airborne 12.17.25: Skydiver Hooks Tail, Cooper Rotax Mount, NTSB v NDAA

Also: New Katanas, Kern County FD Training, IndiGo’s Botched Roster, MGen. Leavitt Named ERAU Dean The Australian Transportation Safety Bureau (ATSB) has wrapped up its inves>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC