Boeing 737 MAX 10 Approved for Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Nov 27, 2023

Boeing 737 MAX 10 Approved for Testing

With Backorders Waiting, Certification Can't Come Soon Enough for Paused Model

Boeing's 737 MAX 10 has been given the go-ahead for type-inspection authorization by the FAA, allowing the regulator to begin its own testing on the aircraft after hundreds of in-house flights.

Boeing is understandably antsy to get that type certificate in hand for the MAX 10, given a long line of backorders that numbers somewhere north of 1,000 aircraft. The MAX 10's development timeline suffered badly at the hands of the 737 MAX debacle, being grounded after some highly visible crashes and a continued subject of congressional humming and hawing. Design changes mandated by the MAX family's regulatory review added additional delays to the process, shaking up the flight deck of the near-production aircraft at the 11th hour with a few new switches and alarms.

Ultimately, despite rolling off the line into fresh air for the first time in 2019, the aircraft didn't take flight until midway through 2021. The delay gave Airbus a rare chance to pick up orders around the world, particularly finding success with a new crop of ULCC's and aircraft lessors. But time is up for the long time rival - Boeing says it expects MAX 10 certification by 2024.

Boeing's delay in shipping the MAX 10 has had a trickle-down effect on carriers as they keep older 737 aircraft beyond their original retirement date. Southwest Airlines, an all-Boeing fleet operator, is currently waiting on a bit fewer than 200 MAX-10s, once expecting the first deliveries of the type in 2022.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC