Lockheed Martin Wins $141 Million Contract To Upgrade Portuguese P-3Cs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sat, Jan 05, 2008

Lockheed Martin Wins $141 Million Contract To Upgrade Portuguese P-3Cs

Five Planes To Receive Updated Mission Avionics

The Portuguese Ministry of Defense recently awarded Lockheed Martin a direct commercial sale contract, valued at $141 million, to upgrade the mission system avionics on five P-3C maritime surveillance aircraft. Under the contract, Lockheed Martin will provide a full mission system upgrade for the Portuguese Air Force aircraft.

Upgrades include electronic support measures, acoustics, communications, electro-optic and infrared systems, as well as new data management software and hardware, including controls, displays and mission computers. Systems design, development and integration work will be completed at Lockheed Martin'sEagan-based Tactical Systems line of business.

After equipment installation and checkout at Lockheed Martin's Aircraft and Logistics Center in Greenville, SC, the first modernized Portuguese Air Force P-3C aircraft will be delivered in late 2009.

"Portugal has a large area of maritime patrol responsibility that requires a multi-mission capable system to assist with economic zone protection, search and rescue, security issues and illegal immigration," said Vice Admiral Carlos Alberto Viegas Filipe, Portugal 's national armaments director. "The modernization fielded under this contract will significantly enhance the Portuguese Air Force's ability to meet their multi-mission requirements, and is a key component in enabling them to continue performing this mission for the foreseeable future."

"Lockheed Martin is honored to have this opportunity and looks forward to delivering mission capable aircraft for a key NATO partner and long time P-3 operator," said Richard Udicious, vice president and general manager of Lockheed Martin's Tactical Systems line of business. "With over 90 percent of all active duty P-3's carrying our mission systems, we know the upgraded Portuguese P-3C aircraft will be capable of performing at a world-class level. Our upgrades provide enhanced capabilities that will allow the Portuguese Air Force to expand its roles in both humanitarian and military operations."

The P-3C is the primary maritime surveillance aircraft operated by the US Navy and 15 international allies. Its roles include anti-submarine warfare; anti-surface warfare; over water or overland intelligence, surveillance and reconnaissance; and network centric warfare, such as command, control and communications. Additionally, the capabilities of the P-3C make it an ideal platform for a number of secondary missions, including search and rescue, drug interdiction, airborne early warning and electronic warfare.

FMI: www.lmco.com, www.emfa.pt/www/index.php

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC