Dreamliner Flight Testing Suspended | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.20.25

AirborneNextGen-
10.21.25

Airborne-Unlimited-10.22.25

Airborne-FltTraining-10.23.25

AirborneUnlimited-10.17.25

Thu, Nov 11, 2010

Dreamliner Flight Testing Suspended

Boeing Reports An Electrical Fire On 787 ZA002, Crew Executed An Emergency Landing

During approach to Laredo, Texas on Tuesday, Boeing's Dreamliner ZA002 lost primary electrical power as a result of an onboard electrical fire. Backup systems, including the deployment of the Ram Air Turbine (RAT), functioned as expected and allowed the crew to complete a safe landing. The cause of the fire is still under investigation.


Dreamliner ZA002 File Photo

In a statement on the company website, Boeing said the pilots executed a safe landing and at all times had positive control of the airplane and all of the information necessary to perform that safe landing. Initial inspection appears to indicate that a power control panel in the aft electronics bay will need to be replaced on ZA002. Boeing is inspecting the power panel and surrounding area near that panel to determine if other repairs will be necessary.

The company has retrieved flight data from the airplane and is analyzing it in Seattle, according to the statement. They expect that process will take several days. The team was conducting monitoring of the Nitrogen Generation System at the time of the incident but there is no reason to suspect that the monitoring or earlier testing of that system had anything to do with the incident.


Dreamliner ZA002 File Photo

Boeing says that until the cause of the electrical fire is better understood, flight testing on the dreamliner is suspended. Boeing officials say that decision is consistent with the company's internal processes. Ground test activities will be conducted until flight test resumes.

The statement also says that it is impossible to determine the impact of this event on the overall program schedule until the data is analyzed. Teams will continue to work until analysis is complete and a path forward is determined.

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (10.23.25)

“Sport Pilot 2.0 gives more people than ever the opening to pursue their dreams of putting themselves in the pilot seat and enjoying the unique perspectives of flight. This v>[...]

ANN's Daily Aero-Linx (10.23.25)

Aero Linx: Canadian Business Aviation Association (CBAA) The Canadian Business Aviation Association (CBAA) is a non-profit association formed in 1961 as Canada's voice for business>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Kitfox Upgrades Back-Country Undercarriage

From 2023 (YouTube Edition): Acme Aerofab Black Ops Gear and Suspension Impress The viability of a backcountry aircraft is a function of numerous purpose-built components and syste>[...]

Airborne-NextGen 10.21.25: NZ Goes Electric, World Cup UAVs, eAviation Shuttered

Also: SkyFly’s Axe Prototype, USAF CCA, AV Expands Switchblade, DropShip Cargo Drone Air New Zealand has taken its first big step toward electric aviation, flying the US-buil>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC