Dreamliner Flight Testing Suspended | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Nov 11, 2010

Dreamliner Flight Testing Suspended

Boeing Reports An Electrical Fire On 787 ZA002, Crew Executed An Emergency Landing

During approach to Laredo, Texas on Tuesday, Boeing's Dreamliner ZA002 lost primary electrical power as a result of an onboard electrical fire. Backup systems, including the deployment of the Ram Air Turbine (RAT), functioned as expected and allowed the crew to complete a safe landing. The cause of the fire is still under investigation.


Dreamliner ZA002 File Photo

In a statement on the company website, Boeing said the pilots executed a safe landing and at all times had positive control of the airplane and all of the information necessary to perform that safe landing. Initial inspection appears to indicate that a power control panel in the aft electronics bay will need to be replaced on ZA002. Boeing is inspecting the power panel and surrounding area near that panel to determine if other repairs will be necessary.

The company has retrieved flight data from the airplane and is analyzing it in Seattle, according to the statement. They expect that process will take several days. The team was conducting monitoring of the Nitrogen Generation System at the time of the incident but there is no reason to suspect that the monitoring or earlier testing of that system had anything to do with the incident.


Dreamliner ZA002 File Photo

Boeing says that until the cause of the electrical fire is better understood, flight testing on the dreamliner is suspended. Boeing officials say that decision is consistent with the company's internal processes. Ground test activities will be conducted until flight test resumes.

The statement also says that it is impossible to determine the impact of this event on the overall program schedule until the data is analyzed. Teams will continue to work until analysis is complete and a path forward is determined.

FMI: www.boeing.com

Advertisement

More News

NTSB Prelim: Sikorsky UH60 Sikorsky UH-60

Sikorsky UH-60 Black Hawk Helicopter Collided With An Unregistered DJI Mavic 3T Unmanned Aerial Vehicle On July 7, 2025, about 1557 central daylight time, an unregistered Sikorsky >[...]

Aero-News: Quote of the Day (11.13.25)

“After considering the measures taken, minimum liquidity covenants in the Company's current debt obligations and cash flows to maintain current operational obligations requir>[...]

ANN's Daily Aero-Term (11.13.25): Ground Clutter

Ground Clutter A pattern produced on the radar scope by ground returns which may degrade other radar returns in the affected area. The effect of ground clutter is minimized by the >[...]

ANN's Daily Aero-Linx (11.13.25)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Airborne 11.07.25: Affordable Expo Starts!, Duffy Worries, Isaacman!

Also: Louisville UPS Crash Aftermath, Taiwan Boosts Pilot Pool, Spartan Acquires, DON’T MISS the MOSAIC Town Hall! This three-day Affordable Flying Expo brings together indoo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC