AD: Airbus | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Apr 24, 2011

AD: Airbus

AD NUMBER: 2011-08-05

MANUFACTURER: Airbus Model A310 Series Airplanes; and Model A300 B4-600, A300 B4-600R, A300 F4-600R Series Airplanes, and Model A300 C4-605R Variant F Airplanes (Collectively Called A300-600 Series Airplanes)
SUBJECT: Airworthiness Directive 2011-08-05

SUMMARY: This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:

The ball screw nut assemblies of the first 70 Trimmable Horizontal Stabilizer Actuators (THSA) manufactured by Goodrich were fitted with an upper attachment gimbal having a thickness of 58 mm (2.28 in), which is different from the design of the final production standard. The gimbal installed on the subsequent THSAs (final production standard) is more robust, having a thickness of 70mm (2.76 in).

During the fatigue life demonstration of the THSA upper attachment primary load path elements, only a gimbal having a thickness of 70mm (2.76 in) was used. Thereafter, no additional justification work to demonstrate the robustness of the upper attachment fitted with a gimbal of 58 mm was accomplished. In case of failure of this gimbal, the THSA upper attachment primary load path would be lost and the THSA upper attachment secondary load path would engage.

Because the upper attachment secondary load path will only withstand the loads for a limited period of time, the condition where it would be engaged and not detected could lead to failure of the secondary load path, which would likely result in loss of control of the airplane.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/4A83EE30CAAE6375862578790051C638?OpenDocument

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC