Busy Weekend Ahead For Atlantis Techs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Sep 27, 2009

Busy Weekend Ahead For Atlantis Techs

Shuttle Being Prepped For October Mission

This weekend at NASA's Kennedy Space Center in Florida, technicians will continue preparing Atlantis for its move, or rollover, from Orbiter Processing Facility-1 to the Vehicle Assembly Building, targeted for October 6th.

Pre-rollover preparations this weekend include work on the shuttle's thermal protection system, or heat shield, and application of waterproofing to the payload bay door hinge line. Atlantis' payload bay door will be closed today.

Meanwhile, the shuttle's hatch also is being prepared to be closed. Final prep work is ongoing on the forward and wing sections of the shuttle and temporary doors will be installed to support rollover.

After Atlantis is rolled into in the VAB, it will be hoisted off the transfer aisle and joined with the external fuel tank and solid rocket boosters that already have been stacked on the mobile launcher platform in High Bay 2.

Rollout to Kennedy's Launch Pad 39A is scheduled for October 13th.

FMI: www.nasa.gov

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC